Primary Meter Section on Work Order Tab

Question & Answer


Question

Should the Primary Meter field be editable?

Answer

Work order Tracking (Tr) has a section titled "Primary Meter". The section contains many fields that are read-only.

For this section to be editable there must be an asset with a primary meter defined. On the Meters tab of the Assets (Tr) application make sure that the "Primary Meter" check box is checked.




Once the asset with a primary meter is added to the work order, the "Primary Meter" section will become editable

[{"Product":{"code":"SSLL9Z","label":"Maximo for Transportation"},"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Component":"Work Order Tracking (Tr)","Platform":[{"code":"PF033","label":"Windows"},{"code":"PF002","label":"AIX"},{"code":"PF010","label":"HP-UX"},{"code":"PF016","label":"Linux"},{"code":"PF027","label":"Solaris"}],"Version":"7.5;7.5.1","Edition":"Edition Independent","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
17 June 2018

UID

swg21701330