IBM Support

IJ50073: PR RECORD NOT BEING ROUTED/ASSIGNED WHEN CALENDAR BASED ASSIGNMENT IS THE OPTION SET ON WORKFLOW NODE

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • Whenever a PR is being routed, in Workflow, to next role having
    calendar based assignment, if the shift associated to the next
    person in route does not having the work periods defined for the
    duration mentioned on the workflow assignment, the workflow is
    not getting routed and assigned but does nothing.
    
    Here are the steps:
    
    Go to Roles and create a new role (PGCAL)
    -Type: A set of data related to the record
    -Object: PR
    -Value: :supervisor, Broadcast checkbox is checked
    
    In Workflow Designer, create a new 1 task process for PR
    (CALBASEPG)
    -Assignment table add Role: PGCAL and check Calendar Based? add
    duration as 72:00
    -Click ok to close and ad the action lines from start to task to
    stop
    -Save, Enable, Activate
    
    Go to People record
    -recall the supervisor record to be used ADAMS
    -Ensure -> Calendar=DAY and Shift=DAY
    
    Go to Modify Person availability , add vacation for next 3 days.
    
    
    Enter Work Dates with reason code as VAC for next 3 days.
    
    Go to Calendar application-> open the record Calendar=DAY
    
    Click on Work Periods tab
    
    Filter with Shift=DAY configured on Labor record for supervisor.
    
    
    Remove the shift entries for the next 2 days ( after the date of
    the route of PR i.e. if PR is getting routed on September 28th,
    remove the work periods on 29th September and 2nd October) . Do
    not remove work period on September 28th
    
    NOTE: if the next future dates are the weekend, the weekend
    dates are not included in the Work Periods, therefore, remove
    the business dates for the number of days in the future
    stipulated above i.e. 2 days
    
    Go to PR application and insert new PR and enter the the labor
    record that was configured for supervisor on PR-Supervisor field
    
    
    Save the record.
    
    Initiate Workflow (CALBASEPG process).
    
    
    
    RESULT: the following system message is thrown and the pr record
    does NOT get assigned. If you go to the left-hand navigation
    panel and select Workflow-View Workflow Assignments from the
    menu option, the resulting dialog box is BLANK.
    
    BMXAA4407E - A nested exception caused the workflow process to
    fail.
    null
    
    EXPECTED RESULTS: the pr record should be assigned to ADAMS
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Maximo users                                                 *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * Whenever a PR is being routed in Workflow to the next role   *
    * that has a calendar-based assignment, if the shift           *
    * associated to the next person in route does not have the     *
    * work periods defined for the duration mentioned on the       *
    * workflow assignment, the workflow is not getting routed and  *
    * assigned                                                     *
    ****************************************************************
    

Problem conclusion

  • The fix for this APAR will be contained in a future release.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ50073

  • Reported component name

    MAXIMO ASST MGM

  • Reported component ID

    5724R46AM

  • Reported release

    761

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2024-02-15

  • Closed date

    2024-06-03

  • Last modified date

    2024-06-03

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO ASST MGM

  • Fixed component ID

    5724R46AM

Applicable component levels

[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSLKT6","label":"Maximo Asset Management"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"761","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
03 June 2024