IBM Support

IT44267: SLOW PERFORMANCE OF PARALLEL SQL DATABASE OR LOG BACKUPS

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • Either SQL database or log backup is slow when parallel jobs run
    at the same time. The time gap can be seen as following:
    
    
    CTGGA2227,Cluster host <sql-server> is resolved to application
    server <sql-server-host-name>
    CTGGA2222,Cataloged x instances  x database groups x databases
    x folders  x labels  x volumes and x disks from server
    <sql-server-host-name>
    
    
    It is found that some global locks prevent different jobs from
    cataloging at the same time.
    
    
    Versions affected: IBM Spectrum Protect Plus v10.1.*
    
    Additional keywords: TS012966444 SPP
    

Local fix

  • N/A
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * IBM Spectrum Protect Plus level 10.1.x.                      *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * IBM Spectrum Protect Plus                                    *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Apply fixing level when available. This problem is currently *
    * projected to be fixed in IBM Spectrum Protect Plus level     *
    * 10.1.15.1 and 10.1.16. Note that this is subject to change   *
    * at the discretion of IBM.                                    *
    ****************************************************************
    

Problem conclusion

  • This problem has been fixed so that the performance of parallel
    SQL database and log backup jobs will be improved.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IT44267

  • Reported component name

    SP PLUS

  • Reported component ID

    5737SPLUS

  • Reported release

    A1E

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2023-08-01

  • Closed date

    2023-08-03

  • Last modified date

    2023-08-03

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    SP PLUS

  • Fixed component ID

    5737SPLUS

Applicable component levels

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSNQFQ","label":"IBM Spectrum Protect Plus"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A1E","Line of Business":{"code":"LOB26","label":"Storage"}}]

Document Information

Modified date:
01 February 2024