IBM Support

IJ45918: GRAPHICAL SCHEDULER CALENDAR DOES NOT RENDER CORRECTLY.

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • When the Move to Day Option is used on the graphical view tab
    the calendar pop-up does not render correctly. The Month across
    the top does not run the whole length of the pop up and the year
    options on the bottom are not clearly visible.
    
    
    Steps to reproduce:
    
    1. Go To Graphical Scheduling application (or any other Schedule
    app that has Graphical View)
    
    2. Create a Schedule record with some WOs and Save.
    
    3. Switch to Graphical View tab and select any WO and
    right-click > Move to Day (to open the calendar popup)
    
    Actual Result:
    The Calendar popup shows but the Month name is not across the
    entire box, it is shifted to the left-hand side of the screen.
    Also, the date year across the bottom is not correctly
    displayed.
    
    
    Expected Result:
    The calendar should open and display correctly.
    
    System Information:
    
    Maximo Scheduler 7.6.8
    

Local fix

  • n/a
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Scheduler users                                              *
    ****************************************************************
    

Problem conclusion

  • A fix for this APAR was included in Manage 8.5 REL.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ45918

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    768

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2023-03-20

  • Closed date

    2023-03-23

  • Last modified date

    2023-03-23

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"768","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
24 March 2023