Error description
PROBLEM DESCRIPTION: The Next Meter Reading and Units to Go values for a meter-based PM are incorrectly calculated when a meter is first added. This occurs because the Meter Reading [PMMETER.LASTPMWOGENREAD] value is blank at that stage due to no Work Order being generated yet when the Frequency has not been reached yet. The calculation does not take the Assets Life To Date value into account. STEPS TO REPRODUCE: - Go to Assets application. - Create a new Asset record - In Meters tab, add existing Meter ODOM-KM (Type = Continuous, Unit of Measure = MILES) and add Average Calculation Method = ALL, Reading Type = ACTUAL, Accept Rolldown from = ASSET. Save the record. - Go to Enter Meter Readings option and enter value 10,000. - The Life to Date fore Asset field [ASSETMETER.LIFETODATE] now has the same value = 10,000 - Change status of Asset to OPERATING. - Go to Preventive Maintenance. - Create a new PM and add the newly-created Asset. - In Frequency tab / Meter-Based Frequency, add the Meter (ODOM-KM), Frequency = 400, Generate WO Ahead By = 10. - Generate Work Order Based on Meter Readings (Do Not Estimate)? = checked, and Generate Work Order When Meter Frequency is Reached? = checked - Save the PM. - Change the PM status to ACTIVE. - It shows Next Meter Reading = 400 and Units to Go = -9,610 - Those values are incorrect: it should be Next Meter Reading = 10,400 and Units to Go = 390 - Go to the Assets application, select the record and do Enter Meter Readings. - For that Meter ODOM-KM, enter Reading = 10,500 and OK. This is 500 above the initial Reading value and therefore above the Frequency of 400. - Open the PM in the Preventive Maintenance application. - It has Counter = 1, so one WO has been generated because the Frequency has been reached. - In Frequency tab / Meter-Based Frequency, it now shows new values: Meter Reading = 10,500 (which is correct) and in Next Work Order Projections: Next Meter Reading = 10,900 (this is latest Meter Reading + Frequency) and Units to Go = 390 (ie Frequency - Generate WO Ahead By). RESULTS: The Next Meter Reading and Units to Go values are incorrect in the PM record until the Frequency has been reached because the Meter Reading [PMMETER.LASTPMWOGENREAD] value is still blank at that stage. EXPECTED RESULTS: The Life To Date value on the Asset should be taken into account while the PMs Meter Reading value is still blank. REPORTED IN VERSION: Maximo 7.6.1.3
Local fix
N/A
Problem summary
**************************************************************** * USERS AFFECTED: * * MAXIMO * **************************************************************** * PROBLEM DESCRIPTION: * * INCORRECT NEXT METER READING AND UNITS TO GO VALUES FOR A * * METER-BASED PM WHEN METER IS FIRST ADDED * ****************************************************************
Problem conclusion
Temporary fix
Comments
APAR Information
APAR number
IJ45409
Reported component name
MAXIMO ASST MGM
Reported component ID
5724R46AM
Reported release
761
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2023-02-14
Closed date
2023-05-15
Last modified date
2023-05-15
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
MAXIMO ASST MGM
Fixed component ID
5724R46AM
Applicable component levels
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSLKT6","label":"Maximo Asset Management"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"761","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
15 May 2023