IBM Support

IT42315: OFFLOAD TO AZURE FAILS WITH "THE WRITE OPERATIONS TIMED OUT"

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • During offload to Azure with a connection throttled, IBM
    Spectrum Protect Plus can  hit timeouts that are  specific to
    Azure because its SDK behaves differently from all other cloud
    providers.
    
    The job log will show:
    WARN,<<<date>>>,CTGGA1915,Error occurred on Storage vSnap
    replication Please check vSnap Storage logs.
    ERROR,<<<date>>>,CTGGA0309,Copy failed for snapshot (ID: 3712)
    from source [server: server.com  volume:
    spp_1148_2563_1801f7b0895__1801f7b106f_15_vsnap
    
      snapshot: spp_1148_2581_89_182aeff4a48] to target [server:
    https://web.address.net:443  volume: bucket].
    
      Error: Exception: Failed to upload metadata: ('Connection
    aborted.'  timeout('The write operation timed out' ))
    ERROR,<<<date>>>,CTGGA0310,Skipping remaining snapshots for
    volume
    ....
    
    
    IBM Spectrum Protect Plus Versions Affected:
    IBM Spectrum Protect Plus 10.1.3 and later
    
    
    
    Additional Keywords: SPP, SPPlus, TS010337277, metadata,
    AZURE, CLOUD
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * IBM Spectrum Protect Plus levels 10.1.3, 10.1.4, 10.1.5,     *
    * 10.1.6, 10.1.7, 10.1.8, 10.1.9, 10.1.10, 10.1.11, and        *
    * 10.1.12                                                      *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * See Error Description                                        *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Apply fixing level when available. This problem is currently *
    * projected to be fixed in IBM Spectrum Protect Plus level     *
    * 10.1.12.2 and 10.1.13. Note that this is subject to change   *
    * at the discretion of IBM.                                    *
    ****************************************************************
    

Problem conclusion

  • Implemented code fixes to introduce configurable timeouts and
    implemented higher than default timeouts for uploads to Azure
    Blob storage.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IT42315

  • Reported component name

    SP PLUS

  • Reported component ID

    5737SPLUS

  • Reported release

    A13

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2022-10-21

  • Closed date

    2022-11-10

  • Last modified date

    2022-11-10

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    SP PLUS

  • Fixed component ID

    5737SPLUS

Applicable component levels

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSNQFQ","label":"IBM Spectrum Protect Plus"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A13","Line of Business":{"code":"LOB26","label":"Storage"}}]

Document Information

Modified date:
01 February 2024