Error description

  • When changing the Order Unit and the Quantity on the PO Line and
    the "Inspection Required?" has been checked in the Receiving
    application, the item is received as COMP and the Inventory
    Current Balance is incorrect. However if the "Inspection
    Required?" is not checked the calculation is correct and the PO
    is received as PARTIAL.
    
    STEPS TO REPRODUCE:
    a. Create New Item, Issue Unit = EACH, Order Unit Box. Add
    Conversion Factor 1 BOX = 12 Each.
    Item: DFTESTITEM
    Rotating: unchecked
    Order Unit: BOX
    Issue Unit: EACH
    More Actions > Unit of Measure and Conversion > Add/Modify
    Conversions
    Click New Row
    From Unit of Measure: BOX
    To Unit of Measure: EACH
    Conversion Factor: 12
    Item number: DFTESTITEM
    Click OK
    b. Change Status of Item to Active.
    c. Add Item to Storeroom CENTRAL
    Issue Cost Type: AVERAGE
    Default Bin= A-5-6
    Unit Cost: 25.00
    Current Balance: 0
    Issue Unit: EACH
    Order Unit: BOX
    Change Status: Active
    d. Go To Inventory > Reorder Details tab
    Change Reorder Point: 5
    EOQ = 2 (2 Box).
    e. Run Reorder Manually, More Actions Reorder > Reorder Items
    Created PR: 1146
    Qty: 2
    Order Unit: BOX
    Issue Unit: EACH
    Conversion Factor: 12
    Approve PR.
    Changed Status: APPR
    f. Create PO from PR
    More Actions > Create PO
    Click Autonumber > OK
    Create PO: 1236
    g. In the PO, POLINE-1, check the inspection Required Flag box.
    The Unit Cost = $375. So, total poline cost = $750 (2 box * $375
     = $750).  Total Qty Order = 2 Box (or equal to 2*12 = 24 Issue
    Unit) Go To Purchase
    Orders The Unit Cost = $375. So, total poline cost = $750 (2 box
    * $375 = $750).  Total Qty Order = 2 Box (or equal to 2*12 = 24
    Issue Unit)
    Go To Purchase Orders
    PO: 1236
    Click PO Lines tab > expand the line
    Inspection Required: check this box
    h. Approve PO.
    i. Receiving app. Perform Partial Receipt.
       In this case the the vendor will only send Qty = 8 and Unit
    of Order = EACH (vendor is only sending 8 each of qty instead of
    2 box (2 x 12 each).
    1. Select Order Item >> Check Item >> Click OK.
    2. Expand Material line
       Modify Order Unit = EACH.
       Qty = 8
       Save Receiving Transaction.
    j. More Actions > Change Inspection Status. OK
    k. Status on the PO Receipts: Complete
    PO Line > Insp. Status: COMP
    l. Go To Inventory from Item field and the Current Balance: 96
    
    Actual Result:
         POLINE is fully receipt. Qty On Hand in the storeroom = 96
    (8x12) - Incorrectly.
         PO Status is COMPLETE (Full Receipt).
    
    Expected Result:
         POLINE is receipt it partially. Qty Received = 8. Qty On
    Hand in the storeroom =         8 (increase from 0 to 8).  PO
    Status is Partially Receipt.
    
    
    *** Perform the above steps a to g but in step g DO NOT check
    the Inspection Required box
    1. Created an Item
    Item: DFTESTITEM1
    Issue Cost Type: AVERAGE
    Order Unit: BOX
    Issue Unit: EACH
    Unit Cost: 25.00
    Default Bin: A-63
    2. In Inventory app, Update Reorder Point = 5 and EOQ = 2 (2
    Box).
    Save
    3. Run Reorder Manually --> PR
    Created PR: 1147
    Qty: 2
    Order Unit: BOX
    Conversion Factor: 12
    Approve PR.
    Changed Status: APPR
    4. More Actions > Create PO
    Click Autonumber > OK
    Create PO: 1237
    5. In the PO, POLINE1 - Check the "Inspection Required" box
    Unit Cost = $375.
    6. Go To Purchase Orders - this is step 'g' from the above
    PO: 1237
    Click PO Lines tab > expand the line
    *** Inspection Required: leave this box unchecked
    7. Approve PO.
    8. Receiving app, Perform Partial Receipt
    Select Order Item >> Check >> Click OK
    9. Expand Material line
    Change Order Unit = BOX to EACH
    Qty = 8
    Save Receiving Transaction.
    
    Results and Expected Results:
    PO received status is PARTIAL and the Inventory Item's Current
    Balance is 8
    
    
    REPORTED IN VERSION:
    7.6.1.2
    

Local fix

Problem summary

  • ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * When changing the Order Unit and the Quantity on the PO Line *
    * and the "Inspection Required?" has been checked in the       *
    * Receiving application, the item is received as COMP and the  *
    * Inventory Current Balance is incorrect.                      *
    ****************************************************************
    

Problem conclusion

  • The fix for this APAR will be contained in a future release.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ41487

  • Reported component name

    MAXIMO ASST MGM

  • Reported component ID

    5724R46AM

  • Reported release

    761

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2022-08-05

  • Closed date

    2023-07-05

  • Last modified date

    2023-07-05

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO ASST MGM

  • Fixed component ID

    5724R46AM

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSLKT6","label":"Maximo Asset Management"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"761","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
05 July 2023