IJ33791: INCORRECT LOAD CHART DISPLAY IN GSLP

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • PROBLEM: Incorrect load chart display in GSLP when the task is
    scheduled cross multiple shifts.
    
    EXPECT RESULT: The Load should be at a single Shift once that is
    able to fit on the single load
    
    Reproduce steps:
    Config 2 work orders with 27 h duration, each work order has one
    task with same duration. Each task requires for 27h of a
    craft(Say MECH) with quantity 1.
    create work list based on these 2 work orders. Select a shift
    with 8 hours working time
    Load MECH alternative availability as 1.
    Run optimization.
    
    Expected Result: The total consumption hours for MECH in load
    chart should be 27*2=54. It should align with  optimization
    result that 8 hours for the first 6 shifts and 6 hours in the
    7th shift.
    
    
    
    Problem: Once the Second Work Order starts after the start time
    of the Shift the Load of the Work get partial.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Scheduler users                                              *
    ****************************************************************
    

Problem conclusion

  • The fix for this APAR is contained in the following
    maintenancepackage:
    Release 7.6.1.3 of Base Services
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ33791

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    761

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2021-07-16

  • Closed date

    2021-07-16

  • Last modified date

    2021-07-16

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

[{"Line of Business":{"code":"LOB59","label":"Sustainability Software"},"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"761"}]

Document Information

Modified date:
18 July 2021