Fixes are available
Operational Decision Manager V8.9.2.2: Interim Fix 6
Operational Decision Manager V8.9.2.2: Interim Fix 7
IBM Operational Decision Manager V8.10.3 Download Document
IBM Operational Decision Manager V8.10.3 Mod Pack
Operational Decision Manager for z/OS 8.10.3 Mod Pack
Operational Decision Manager V8.9.2.2: Interim Fix 9
Operational Decision Manager V8.9.2.1: Interim Fix 20
Operational Decision Manager V8.9.2.2: Interim Fix 10
Operational Decision Manager V8.9.2.2: Interim Fix 11
IBM Operational Decision Manager V8.9.2.3 Fix Pack
IBM Operational Decision Manager for z/OS 8.9.2.3 Fix Pack
Operational Decision Manager V8.9.2.1: Interim Fix 22
Operational Decision Manager V8.9.2.1: Interim Fix 23
Operational Decision Manager V8.9.2.1: Interim Fix 24
Operational Decision Manager for z/OS 8.10.2.2 Fix Pack
IBM Operational Decision Manager V8.10.2.2 Fix Pack
Operational Decision Manager V8.9.2.1: Interim Fix 26
Operational Decision Manager V8.9.2.1: Interim Fix 27
Operational Decision Manager V8.9.2.2: Interim Fix 13
Operational Decision Manager V8.9.2.1: Interim Fix 28
Operational Decision Manager V8.9.2.1: Interim Fix 30
Operational Decision Manager V8.9.2.1: Interim Fix 31
Operational Decision Manager V8.9.2.2: Interim Fix 14
Operational Decision Manager V8.9.2.1: Interim Fix 34
Operational Decision Manager V8.9.2.2: Interim Fix 15 for Decision Center
IBM Operational Decision Manager V8.10.4 Mod Pack
APAR status
Closed as program error.
Error description
When using dynamic domain from excel file and the B2X cells contains leading or trailing spaces or a new line, Business Console always detects b2x changes. Applying the changes by clicking the Apply button does not solve this issue.
Local fix
Remove any leading or trailing spaces or any new line in the b2x cell of the Excel file.
Problem summary
**************************************************************** * USERS AFFECTED: * * Decision Center users. * **************************************************************** * PROBLEM DESCRIPTION: * * The Business Console detects b2x changes by compareing the * * b2x value build by the XML parser without leading spaces * * with the one read from the excel with leading spaces. * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
The code was fixed.
Temporary fix
Remove any leading or trailing spaces or any new line in the b2x cell of the excel file.
Comments
APAR Information
APAR number
RS03460
Reported component name
WS DECISION CTR
Reported component ID
5725B6900
Reported release
892
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2019-09-13
Closed date
2019-09-17
Last modified date
2019-09-17
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
WS DECISION CTR
Fixed component ID
5725B6900
Applicable component levels
R892 PSY
UP
Document Information
Modified date:
24 November 2021