APAR status
Closed as program error.
Error description
PROBLEM: Work Order - Repair Facility - ASSIGNMENT Location section is not working as it should End Dates MUST BE START DATE PLUS THE DURATION GETTING THE END DATE PERFORMANCE ISSUE: NO STEPS TO REPRODUCE: - Create some Work Duration and Start Date - Check the Repair Facility Flag (Remember that the Repair Facility Flag should be turn on at the Organization level) Steps to Reproduce 1-) Go to the Work Order tracking application 2-) Create a New record and setup with duration and Schedule Start 3-) Set the Repair Facility value over the field at Work Order man page 4-) Move over the Assignment Tab and Check the Location Assignment section CURRENT ERRONEOUS RESULT: The Values of the Schedule End Dates was not setup according with Start + Duration EXPECT RESULT: The Location record should get Start and End value ADDITIONAL INFO: NO ENVIRONMENT (SYSTEM INFO): App Server Weblogic Application Server 12.1.1.0 Version Tivoli's process automation engine 7.6.0.9-IFIX20180330-1643 Build 20171127-0100 DB Build V7609-45 HFDB Build HF7609-04 IBM TPAE Integration Framework 7.6.0.9 Build 20171127-2330 DB Build V7609-32 IBM Maximo Asset Management Scheduler Plus 7.6.7.0 Build 20171127-0100 DB Build V7670-01 IBM Maximo Asset Management Scheduler 7.6.7.0 Build 20171127-0100 DB Build V7670-56 HFDB Build HF7670-12 IBM Maximo Asset Management Work Centers 7.6.0.3 Build 20171121-0723 DB Build V7603-175 Server OS Windows Server 2012 R2 6.3 Server DB Oracle 11.2 (Oracle Database 11g Enterprise Edition Release 11.2.0.3.0 - 64bit Production With the Partitioning, OLAP, Data Mining and Real Application Testing options) (c) Copyright IBM Corp. 2017 LOCAL FIX: N/A SECURITY IMPACT (Y/N): N
Local fix
N/A
Problem summary
**************************************************************** * USERS AFFECTED: * * maximo scheduler users * **************************************************************** * PROBLEM DESCRIPTION: * * Work Order - Repair Facility - ASSIGNMENT Location * * section is not working as it should End Dates MUST BE START * * DATE PLUS THE DURATION GETTING THE END DATE * **************************************************************** * RECOMMENDATION: * * Apply fixpack Release 7.6.1.0 of Base Services or request * * an interim fix * ****************************************************************
Problem conclusion
Fix has been made to fix....The fix for this APAR is contained in the following maintenance package: | release\fix pack\interim fix for Release 7.6.1.0 of Base Services(Scheduler 7671)
Temporary fix
Comments
APAR Information
APAR number
IJ05583
Reported component name
MAXIMO SCHEDULE
Reported component ID
5724R46SE
Reported release
767
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2018-04-09
Closed date
2018-04-17
Last modified date
2018-04-17
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
MAXIMO SCHEDULE
Fixed component ID
5724R46SE
Applicable component levels
R767 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
17 April 2018