APAR status
Closed as program error.
Error description
PROBLEM: Seeing a weird bug in the 7.6.0.8 environments where assignment manager errors out if the work order you are assigning doesn't have a duration of 1 or 0 and there's not a planned assignment/labor. If it has a duration of 0 or 1, you can assign any number of labor hours you want. If it it has a duration of 2, however, even if you tried to change the labor hours to 1 it errors out with the error: A value is required for the Assignment Status field on the WMASSIGNMENT object. PERFORMANCE ISSUE: NO STEPS TO REPRODUCE: 1) Go to Assignment Manager Application 2) In the Labor List, click the Modify Availability (far right icon) for Labor ADAM (craft ELECT). 3) Add an entry to the Modify Work dates for some date in the future with 9 hours and a reason code of WORK (I used 9/29/17 at 8 AM but time doesn't matter as long as the date is in the future) 4) Filter the Work List for WO 1218. Click the checkbox next to the 1218 WO with the craft of ELECT in the Work List table and the checkbox next to the ADAMS labor (craft ELECT) in the Labor List. 5) Click Assign Labor in the Common Actions. This works correctly, even though the WO 1218 has a duration of 2. 1) Go to Work Order Tracking 2) Find WO 1013. Change estimated duration from a 0 to a 2. 3) Go to Assignment Manager and filter for WO 1013. 4) Click the checkbox next to 1013 and next to our ADAMS labor record (craft ELECT) and click Assign Labor. Expected: The labor (ADAMS) be assigned to the work order Actual: A dialog will pop up, click OK. You'll receive the BMXAA4195E - A value is required for the Assignment Status field on the WMASSIGNMENT object. error, which is the issue. To make it work, you have to modify the Work Order in Work Order tracking to have a duration of 1 or 0. If you do that, it'll work, but then the work order is incorrect.
Local fix
na
Problem summary
**************************************************************** * USERS AFFECTED: * * Users of the Assignment Manager application. * **************************************************************** * PROBLEM DESCRIPTION: * * IT IS NOT POSSIBLE TO ASSIGN LABOR IN A WORK ORDER WITH A * * DURATION OTHER THAN 0 OR 1 * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
A code fix has been delivered.
Temporary fix
Comments
APAR Information
APAR number
IJ00209
Reported component name
WORK ORDERS
Reported component ID
5724R46WO
Reported release
760
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2017-09-21
Closed date
2017-11-06
Last modified date
2017-11-06
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
MAXIMO
Fix information
Fixed component name
WORK ORDERS
Fixed component ID
5724R46WO
Applicable component levels
R760 PSY
UP
[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCHPPU","label":"Work Order Tracking"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"760","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
06 November 2017