APAR status
Closed as program error.
Error description
In very high concurrency scenarios (3000 virtually simultaneous sessions between the same PNODE/SNODE), PNODE sessions can time out waiting for the SNODE to return the FMH71 protocol message. The Max Socket Read Timeout can be increased on the PNODE to accomodate the delay resulting from the load.
Local fix
STRRTC - 421831 LRB / LRB Circumvention: No workaround available
Problem summary
Users Affected: B2B Integrator 5.2 Problem Description: In very high concurrency scenarios (3000 virtually simultaneous sessions between the same PNODE/SNODE), PNODE sessions can time out waiting for the SNODE to return the FMH71 protocol message. Slow database operations impede performance. Platforms affected: Unix/Linux Windows iSeries
Problem conclusion
Resolution Summary: This database organization and access methods have been redesigned to improve performance. Delivered In: Fixpack 5104, 5020403, 5020500_1
Temporary fix
Comments
APAR Information
APAR number
IT01761
Reported component name
STR B2B INTEGRA
Reported component ID
5725D0600
Reported release
524
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2014-05-13
Closed date
2015-01-21
Last modified date
2015-01-29
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
STR B2B INTEGRA
Fixed component ID
5725D0600
Applicable component levels
R525 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS3JSW","label":"IBM Sterling B2B Integrator"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"5.2.4","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
29 January 2015