APAR status
Closed as program error.
Error description
In Graphical Scheduling (GS) if you use Next Schedule or Previous Schedule while viewing a Schedule on the Graphical View tab, the start of the date ribbon for the subsequent Schedules no longer gets used. This probably happens to other information about the Schedule that is part of the State, too. It happens for zoom factor, too. If you view a schedule, go back to the List tab, view the next Schedule, go back to List and view the next schedule, the date ribbon start saved for each one is used as it should be used. But if go the Graphical View tab and view the first Schedule and then use the Next Schedule arrow on the toolbar to move to the next Schedule, the date ribbon start of the first Schedule is used for all subsequently viewed Schedules. They do not retrieve the State and use that date ribbon start as they should. STEPS TO REPRODUCE: 1. Go to GS and create 3 schedules for different sets of WO. They can all have the same Calendar and Shift and Start/End dates. Set the Start date to be the first of the next month and set the End to be the last day of the next month. If it is September, use October 1 and October 30. 2. Save each one. 3. View the first one on the Graphical View tab. Adjust the Date Ribbon so that the first date shown, the rightmost date, is the first of the month. Save if the Save button un-dims. Click on the List tab. 4. View the second one on the Graphical View tab. Adjust the Date Ribbon so that the first date shown, the rightmost date, is the second of the month. Save if the Save button un-dims. Click on the List tab. 5. View the third one on the Graphical View tab. Adjust the Date Ribbon so that the first date shown, the rightmost date, is the third of the month. Save if the Save button un-dims. Click on the List tab. 6. On the List tab select the first schedule and view it on the Graphical View, you will see that the first date shown is the first of the month. Go back to List tab. 7. On the List tab select the second schedule and view it on the Graphical View, you will see that the first date shown is the second of the month. Go back to List tab. 8. On the List tab select the third schedule and view it on the Graphical View, you will see that the first date shown is the third of the month. Go back to List tab. 9. That is the way it should work. 10. Now on the List tab select the first schedule and view it on the Graphical View, you will see that the first date shown is the first of the month. 11. While still on the Graphical View tab, use the Next Schedule arrow on the toolbar to move to the second schedule. You will see that the first date on the list tab is not the second of the month as it should be but instead is the same as that of the first schedule, the first of the month. 12. While still on the Graphical View tab, use the Next Schedule arrow on the toolbar to move to the third schedule. You will see that the first date on the list tab is not the third of the month as it should be but instead is the same as that of the first schedule, the first of the month. 13. If you had opened the third schedule first and then used the Previous Schedule toolbar arrow to move back to the second and then the first schedules, you would see that the third of the month would be used as the first date on the date ribbon. The data is used from whichever schedule you open first. CURRENT ERRONEOUS RESULT: That for the subsequent schedules it does not look up the saved state for those schedules but uses what is on the screen left over from the first schedule. EXPECTED RESULT: The subsequent schedules should retrieve their own saved states even when opened by using Next/Previous Schedule. ENVIRONMENT (SYSTEM INFO): 7.6.0.9 with IFix 004 or above and 7.6.1.0
Local fix
Do not use Next/Previous Schedule. Or you can collapse the Resource view on the Graphical View tab and then Next/Previous Schedule.
Problem summary
**************************************************************** * USERS AFFECTED: * * Scheduler Users * **************************************************************** * PROBLEM DESCRIPTION: * * When using prev/next the Gantt would retain the Zoom level * * of the previous Gantt * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
Fixed
Temporary fix
Comments
APAR Information
APAR number
IJ08703
Reported component name
MAXIMO SCHEDULE
Reported component ID
5724R46SE
Reported release
767
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2018-08-21
Closed date
2018-09-12
Last modified date
2018-09-12
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
MAXIMO SCHEDULE
Fixed component ID
5724R46SE
Applicable component levels
R767 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]