Direct links to fixes
Tivoli Storage Productivity Center Refresh Pack 5
Refresh Pack 5.2.5 (March 2015) for Tivoli Storage Productivity Center
Fix Pack 5.2.5.1 (April 2015) for Tivoli Storage Productivity Center
Refresh Pack 5.2.6 (June 2015) for Tivoli Storage Productivity Center
Refresh Pack 5.2.7 (August 2015) for Tivoli Storage Productivity Center
IBM Spectrum Control V5.2.8 (December 2015)
IBM Spectrum Control V5.2.9 (February 2016)
IBM Spectrum Control V5.2.10 (May 2016)
IBM Spectrum Control V5.2.10.1 (July 2016)
IBM Spectrum Control V5.2.11 (August 2016)
IBM Spectrum Control V5.2.12 (November 2016)
IBM Spectrum Control V5.2.13 (March 2017)
IBM Spectrum Control V5.2.14 (May 2017)
IBM Spectrum Control V5.2.15 (August 2017)
IBM Spectrum Control V5.2.15.2 (November 2017)
IBM Spectrum Control V5.2.16 (March 2018)
IBM Spectrum Control V5.2.17 (May 2018)
Fix Pack 5.2.7.1 (February 2016) for Tivoli Storage Productivity Center
APAR status
Closed as program error.
Error description
When run the report: "Performance Data Export" the partition runs full, where the DB2 instance TPCDB is. The "Performance Data Export" fails with the following exception: SQL0968C The file system is full. SQLSTATE=57011 RECREATE STEPS: Reporting > View Predefined Reports > Storage Systems > Performance Data Export. The report will fail for the following configuration: Storage system: select a SVC storage subsystem with performance data collected over a period of at least two months. Interval: Sample Reporting period: Custom data range From - To: any interval ( one hour is enough to break the report ) Performance metrics: Volumes
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * TPC 5.2.x users running the report "Performance Data Export" * * for volume metrics. * **************************************************************** * PROBLEM DESCRIPTION: * * See Error Description * **************************************************************** * RECOMMENDATION: * * Apply fix maintenance when available. * ****************************************************************
Problem conclusion
Incomplete JOIN condition generated large amount of unuseful rows which filled in the DB2 temporary space. The JOIN condition has been fixed. The fix for this APAR is targeted for the following maintenance package: | refresh pack | 5.2-TIV-TPC-RP0005 - target March 2015 http://www-01.ibm.com/support/docview.wss?&uid=swg21320822 The target dates for future refresh packs or fix packs do not represent a formal commitment by IBM. The dates are subject to change without notice.
Temporary fix
Comments
APAR Information
APAR number
IT05448
Reported component name
TPC
Reported component ID
5608TPC00
Reported release
522
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2014-11-12
Closed date
2015-01-05
Last modified date
2015-01-05
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
Reports
Fix information
Fixed component name
TPC
Fixed component ID
5608TPC00
Applicable component levels
Document Information
Modified date:
05 October 2023