Direct links to fixes
APAR status
Closed as program error.
Error description
When you run a coach, you see an exception and stack trace similar to the following exception and stack trace in the server side SystemOut.log file: <log> Caused by: com.lombardisoftware.core.TeamWorksException: Resource Bundle Group with name Address_l10n is not attached. at com.lombardisoftware.component.coach.data.CoachDataBindingHelper .generateResourceDeclarations(CoachDataBindingHelper.java:151) at com.lombardisoftware.component.coach.data.CoachDataBindingHelper .generateCoachVariableDeclarations(CoachDataBindingHelper.java:8 4) at com.lombardisoftware.component.coachng.gen.CoachDataBindingGener ator.generate(CoachDataBindingGenerator.java:201) at com.lombardisoftware.component.coachng.gen.CoachGeneratorStage2. generate(CoachGeneratorStage2.java:43) at com.lombardisoftware.component.coachng.worker.CoachNGWorker.getW ebUIData(CoachNGWorker.java:146) at com.lombardisoftware.component.common.worker.WebWorker.doJobRequ estWebInteraction(WebWorker.java:104) at com.lombardisoftware.component.common.worker.WebWorker.doJob(Web Worker.java:73) at com.lombardisoftware.component.common.workflow.ExecutionJob.doJo b(ExecutionJob.java:409) </log> PRODUCTS AFFECTED IBM Business Process Manager (BPM) Advanced IBM BPM Standard IBM BPM Express
Local fix
Problem summary
The issue is caused by a thread-safe problem and occurs when two different threads generate the same coach from the tip at almost the same time.
Problem conclusion
A fix is available for IBM BPM V8.5.5.0 that addresses this thread safety problem. The fix for this APAR on 8.5.5.0 has been superseded and included in cumulative fix for JR52137. On Fix Central (http://www.ibm.com/support/fixcentral), search for JR52137: 1. Select IBM Business Process Manager with your edition from the product selector, the installed version to the fix pack level, and your platform, and then click Continue. 2. Select APAR or SPR, enter JR52137, and click Continue. A fix is also available for IBM BPM V8.5.0.1. The fix for this APAR on 8.5.0.1 has been superseded and included in cumulative fix for JR52730 . To obtain, follow the instruction above, substituting the APAR id with JR52730. A fix is also available for IBM BPM V8.0.1.3. The fix for this APAR on 8.5.0.1 has been superseded and included in cumulative fix for JR53724 . To obtain, follow the instruction above, substituting the APAR id with JR53724. When you download fix packages, ensure that you also download the readme file for each fix. Review each readme file for additional installation instructions and information about the fix.
Temporary fix
Comments
APAR Information
APAR number
JR52291
Reported component name
BPM ADVANCED
Reported component ID
5725C9400
Reported release
801
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2015-01-16
Closed date
2015-03-16
Last modified date
2015-07-22
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
BPM ADVANCED
Fixed component ID
5725C9400
Applicable component levels
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSFTN5","label":"IBM Business Process Manager Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0.1","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
31 August 2023