APAR status
Closed as program error.
Error description
When attempting to connect to an SCLM-managed project, the IBM Developer for z Systems client using the SCLM perspective displays the progress bar with the details "Connecting to SCLM via RSE" and "Sending SCLM commands". However, the process which should be instantaneous takes 5 to 10 minutes to complete. The connection does complete, but the time to complete is excessive.
Local fix
Problem summary
SCLM DT login and some activities are extremely slow and sometimes timeout.
Problem conclusion
SCLM DT is sometimes not detecting the end of an operation, and so is waiting for an operation that is already completed.
Temporary fix
Comments
APAR Information
APAR number
PH20193
Reported component name
DEV FOR Z/OS
Reported component ID
5724T0700
Reported release
E10
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2019-12-11
Closed date
2020-05-15
Last modified date
2020-05-15
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
DEV FOR Z/OS
Fixed component ID
5724T0700
Applicable component levels
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSJK49","label":"IBM Developer for z Systems"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]
Document Information
Modified date:
27 October 2020