Fixes are available
Rational Developer for System z Fix Pack 3 (9.0.1.3) for 9.0.1
Rational Developer for System z Fix Pack 4 (9.0.1.4) for 9.0.1
Rational Developer for System z Fix Pack 5 (9.0.1.5) for 9.0.1
Rational Developer for System z Fix Pack 6 (9.0.1.6) for 9.0.1
Rational Developer for System z Interim Fix 1 for 9.0.1.6
Rational Developer for System z Fix Pack 7 (9.0.1.7) for 9.0.1
APAR status
Closed as program error.
Error description
Abstract: Rational Developer for System z V9.0.1: Generated PL/I code requires update to include LINKAGE (OPTLINK) After generating PL/I code, the generated code required manual updating to include LINKAGE(OPTLINK).
Local fix
Manually add the LINKAGE(OPTLINK)
Problem summary
See error description.
Problem conclusion
The problem listed in this APAR has been resolved with IBM Rational Developer for System z V9.0.1.3 Fix Pack which is available from the Recommended Fixes support download page: http://www-1.ibm.com/support/docview.wss?rs=2294&uid=swg27006335
Temporary fix
Comments
APAR Information
APAR number
PI18348
Reported component name
RATL DEV FOR SY
Reported component ID
5724T0700
Reported release
901
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2014-05-20
Closed date
2014-08-22
Last modified date
2014-08-22
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
RATL DEV FOR SY
Fixed component ID
5724T0700
Applicable component levels
R901 PSY
UP
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSTRMM","label":"IBM Developer for z\/OS"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"901","Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]
Document Information
Modified date:
13 October 2021