A fix is available
APAR status
Closed as fixed if next.
Error description
Rational Programming Patterns - v9.6.0 When trying to load in RPP the result of a MIBJ procedure the validation manager list does not show all expected programs. If a rebuilt is asked to have it completed, the progression bar stays stuck at 35%.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * User that launches the generation manager * **************************************************************** * PROBLEM DESCRIPTION: * * when there are lot of markers on the files (design or cobol) * * the generation is blocked during the process calculation * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
Temporary fix
Comments
APAR Information
APAR number
PI93329
Reported component name
RATL PROG PATTE
Reported component ID
5725H0300
Reported release
960
Status
CLOSED FIN
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2018-02-05
Closed date
2018-04-23
Last modified date
2018-04-23
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Applicable component levels
R850 PSN
UP
R900 PSN
UP
R901 PSN
UP
R910 PSN
UP
R911 PSN
UP
R912 PSN
UP
R950 PSN
UP
R951 PSN
UP
R960 PSN
UP
R961 PSY
UP
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSKPEG","label":"Rational Programming Patterns"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"960","Edition":"","Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]
Document Information
Modified date:
23 April 2018