A fix is available
APAR status
Closed as new function.
Error description
This APAR provides a small program enhancement enhancement (SPE). The BTS V4 SPE includes supports of IMS catalog, a new operand for ELAPTIME and new information messages for APPLFE.
Local fix
N/A
Problem summary
**************************************************************** * USERS AFFECTED: BTS V4.1 USERS * **************************************************************** * PROBLEM DESCRIPTION: BTS V4.1 NEW FUNCTIONS * **************************************************************** * RECOMMENDATION: Apply the maintenance for this APAR. * **************************************************************** This APAR provides a small program enhancement (SPE). This BTS V4 SPE adds support for IMS catalog databases (GUR call), a new operand for the ELAPTIME parameter, and additional informational messages for APPLFE.
Problem conclusion
Temporary fix
Comments
IBM IMS Batch Terminal Simulator for z/OS, Version 4 Release 1, User's Guide (SC19-3230-01) will be updated with following changes: ================================================================ Chapter 14. Command Reference ./O command p.271 | ELAPTIME= YES | NO | ALL __ p.272 | ELAPTIME= | ALL | Indicates that the elapsed time and the start | timestamp of each call are to be included in the | output. | When ELAPTIME=ALL is specified, the elapsed time in | seconds and the start timestamp of each call | ('ELAPSED SEC=x.xxxxxx YYYY/MM/DD HH:MM:SS.SS', | 48 bytes) are added to the trace output of each call. | When the BTSOUT LRECL is more than 181, the output, | which includes the elapsed time and execution time, | is printed on a single line without being split by | the default LRECL 133. Chapter 19. Messages and Codes IMS Batch Terminal Simulator messages p.368 | BTS0136I BTS CALLED THE APPLICATION FRONT-END ROUTINE XXXXXXXX | FOR INITIALIZATION PROCESSING. | Explanation: The indicated application front-end routine is | called for initialization processing. | User response: None | BTS0137I BTS CALLED THE APPLICATION FRONT-END ROUTINE XXXXXXXX | FOR TRANSACTION PROCESSING. | Explanation: The indicated application front-end routine is | called for transaction processing. | User response: None | BTS0138I BTS CALLED THE APPLICATION FRONT-END ROUTINE XXXXXXXX | FOR SHUTDOWN PROCESSING. | Explanation: The indicated application front-end routine is | called for shutdown processing. | User response: None
APAR Information
APAR number
PM61865
Reported component name
IMS BTS
Reported component ID
5655A1400
Reported release
410
Status
CLOSED UR1
PE
NoPE
HIPER
NoHIPER
Special Attention
YesSpecatt / New Function / Xsystem
Submitted date
2012-04-04
Closed date
2012-06-12
Last modified date
2012-07-02
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
UK79481
Modules/Macros
BTSCINT0 BTSCINT1 BTSCOM00 BTSMINT0 BTSMWRT0 BTSOUTPT BTSPCBW0 BTSPCC00 BTSPC000 BTSRC000 BTSRDR00 BTSSINT0 BTSSINT1 BTSSPR00 BTSSUR00
SC19323001 |
Fix information
Fixed component name
IMS BTS
Fixed component ID
5655A1400
Applicable component levels
R410 PSY UK79481
UP12/06/13 P F206
Fix is available
Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.
[{"Line of Business":{"code":null,"label":null},"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCBTY2","label":"IMS Batch Terminal Simulator"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"4.1.0"}]
Document Information
Modified date:
20 October 2020