Fixes are available
IBM Operational Decision Manager V8.10.2 Mod Pack
IBM Operational Decision Manager V8.10.2 Download Document
Operational Decision Manager V8.9.1.0: Interim Fix 35
Operational Decision Manager V8.9.2.2 Fix Pack
Operational Decision Manager for z/OS 8.9.2.2 Fix Pack
Operational Decision Manager V8.9.1.0: Interim Fix 40
Operational Decision Manager V8.9.1.0: Interim Fix 41
Operational Decision Manager V8.9.1.0: Interim Fix 42
APAR status
Closed as program error.
Error description
It is legal to have multiple end nodes, or rather multiple graphical reference to an end node. Unfortunately, the ruleflow editor in BC does define only one end node (which is correct) but repeats the definition of that end node for each reference in the ruleflow view. This creates duplicated definition and when you try to export the ruleapp, the compiler is complaining about those duplicates.
Local fix
If you need to have multiple End Nodes (which is valid) you should use the Ruleflow Editor of the Rule Designer, and synchronize with DC.
Problem summary
**************************************************************** * USERS AFFECTED: * * users generating ruleset archive or running test suite * **************************************************************** * PROBLEM DESCRIPTION: * * It is legal to have multiple end nodes, or rather multiple * * graphical reference to an end node. * * If you create multiple end node in Rule Designer there will * * be only one internal reference to that node created. Note * * that all graphical end node are referencing the same end * * node definition. * * * * Unfortunately, the ruleflow editor in BC does the same so * * there is only one end node defined (which is correct) but * * repeats the definition of that end node for each reference * * in the ruleflow view. * * This creates duplicated definition and when you try to * * export the ruleapp, the compiler is complaining about those * * duplicates. * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
the code is fixed
Temporary fix
Comments
APAR Information
APAR number
RS03349
Reported component name
WS DECISION CTR
Reported component ID
5725B6900
Reported release
890
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2019-03-24
Closed date
2019-04-11
Last modified date
2019-04-11
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
WS DECISION CTR
Fixed component ID
5725B6900
Applicable component levels
R890 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSQP76","label":"IBM Operational Decision Manager"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"890","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
03 November 2021