Fixes are available
APAR status
Closed as program error.
Error description
For a new rule project that is added to an existing decision service with dependancies, it has to stay connected to Decision Center while synchronizing the decision service. Disconnecting the rule project after publish it to Decision Center (keep connection entries) will introduce various errors afterwards in Decision Center while extracting project state, and pulling the projects from Decision Center into a new workspace.
Local fix
Make sure the rule project is connected to Decision Center during the synchronization.
Problem summary
We have a NullPointerException during synchronization with newly added dependent projects because if the sync branch is null this causes an NPE later on in ProjectBranch This can happen if the project was disconnected from Decision Center in RuleDesigner We need to retrieve the sync from the server project infos based on the main project.
Problem conclusion
The code is fixed
Temporary fix
Comments
APAR Information
APAR number
RS02491
Reported component name
WS DECISION CTR
Reported component ID
5725B6900
Reported release
881
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2016-09-06
Closed date
2017-02-16
Last modified date
2017-02-16
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
999
Fix information
Fixed component name
WS DECISION CTR
Fixed component ID
5725B6900
Applicable component levels
R881 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSQP76","label":"IBM Operational Decision Manager"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"881","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
10 January 2022