APAR status
Closed as program error.
Error description
In order to keep control on the server while the server is about to enter BLM it is required that the Top connection is the last connection which is suspended. Otherwise the tool would not be able to spot that there are ongoing calculations after BLM has been enabled and the server is waiting for threads to finish. So therefore this change is a requirement to allow thread cancelling as a second step of escalation.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * All Users * **************************************************************** * PROBLEM DESCRIPTION: * * See error description. * **************************************************************** * RECOMMENDATION: * * Upgrade to IBM Cognos TM1 9.5.1 FP1 or Upgrade to IBM Cognos * * TM1 9.5.2 FP1 or Upgrade to IBM Cognos TM1 10.1.0 * ****************************************************************
Problem conclusion
Code Fix
Temporary fix
Comments
APAR Information
APAR number
PM31762
Reported component name
TM1 SERVER
Reported component ID
5724W49SE
Reported release
951
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2011-02-02
Closed date
2012-02-15
Last modified date
2012-02-15
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
TM1 SERVER
Fixed component ID
5724W49SE
Applicable component levels
R951 PSN
UP
[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SS9RXT","label":"Cognos TM1"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"9.5.1","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
21 September 2021