IBM Support

PM27942: SUPPORT LIU INTEGRITY CHECKER SERVICES TO GENERATE THE RDE IN FPA UNLOAD FUNCTION PROCESSING

A fix is available

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as new function.

Error description

  • This APAR enables the FPA Unload function to support the LIU
    integrity checker services (to generate the RDE).
    This issue is implemented as a result of FITS requirement
    MR032210642.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED: All users of HPFPU Fast Path Advanced Tool   *
    *                 in Fast Path Solution Pack Version 1 Release *
    *                 1 (FMID: HAHQ110) who create an RDE with IMS *
    *                 Library Integrity Utilities (FMID: H27P210). *
    ****************************************************************
    * PROBLEM DESCRIPTION: This APAR enables to create RDEs and    *
    *                      record name/date/time of the subsystem  *
    *                      for the Integrity Checker utility       *
    *                      when FPA Unload function succeeds.      *
    *                      This APAR addresses FITS REQ            *
    *                      MR032210642.                            *
    ****************************************************************
    * RECOMMENDATION: Apply the maintenance for this APAR.         *
    *                 INSTALL CORRECTIVE SERVICE FOR APAR/PTF      *
    ****************************************************************
    This APAR enables to create RDEs and record name/date/time of
    the subsystem for the Integrity Checker utility of IMS Library
    Integrity Utilities for z/OS, Version 2 (FMID: H27P210) when
    FPA Unload function succeeds.
    The warning message is notified when RDEs are not created
    because Integrity Checker finds mismatch between current RDE
    and the DBD which is used in the job step. See the APAR PM28084
    description of IMS Library Integrity Utilities in detail.
    APAR PM28084 is required for IMS Library Integrity Utilities.
    

Problem conclusion

Temporary fix

Comments

  • FPA calls the Integrity Checker API services to notify the
    completion of FPA Unload processing.
    
    This function is activated when the Global Option Module and
    LICON data set for Integrity Checker are found.
    
    ========================
    = DOCUMENTATION CHANGE =
    ========================
    The IMS Fast Path Solution Pack for z/OS Version 1 Release 1
    IMS High Performance Fast Path Utilities User's Guide
    (SC19-2914-00).
    
    1.1.8 Support for IMS Library Integrity Utilities
    
    This topic is changed to include the FPA Unload function.
    
    Restrictions for using Integrity Checker is added as follows.
    * When any of the following error conditions were detected in
    FPA or LIU Integrity Checker processing, the RDEs are not
    created:
      * Either the return code is equal to or greater than 8 or the
      processing ends abnormally for one or more areas in the
      Unload, Reload, Change, or Reorg processing.
      * The return code is equal to or greater than 8 for the
      Analyze function even when Reload, Change, or Reorg function
      completes successfully.
      * In checkpoint restart mode, the RDEs for the areas whose
      the return code of unload processing ends with equal to or
      greater than 8.
      * LIU Integrity Checker fails to create an RDE.
      * When a difference is found between the DBD library and
      the stored RDE in the following functions:
        * Unload function
        * Change function that does not change the DBD definition
        * Reorg function
    
    2.3.3 Running Unload
    
    An additional step 4., which is for creating an RDE, is added
    as follows:
    
    4. Optional step. If you want to create an RDE during the FPA
    process, see 2.4.3 step4.
    
    The following new topic is added under 2.3.3 Running Unload:
    
    2.3.3.1 Considerations on using LIU Integrity Checker
    The checksum value for the randomizer routine, and the checksum
    value for the Edit/Compression routine when the routine is
    defined in the DBD library, are stored in the RDE. You must
    make sure that the libraries that contain the correct routines
    are specified in one of the following DD statements:
        * Unload function
           * IMSRESLB
           * When IMSRESLB is not specified, JOBLIB/STEPLIB
    
    See 2.4.3.1 in more detail.
    
    2.3.5 Utility control statements for Unload process
    
    The LIUGOPT control statement is added to the list of GLOBAL
    command keywords.
    

APAR Information

  • APAR number

    PM27942

  • Reported component name

    IMS FP SOLUTION

  • Reported component ID

    5655W1400

  • Reported release

    110

  • Status

    CLOSED UR1

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    YesSpecatt / New Function / Xsystem

  • Submitted date

    2010-12-01

  • Closed date

    2010-12-28

  • Last modified date

    2011-06-29

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

    UK63534

Modules/Macros

  •    FABLTAPI HFPMCCC0 HFPMESTA HFPMESTB HFPMESTC
    HFPMESTM HFPMEST9 HFPMTRM0 HFPULIU0
    

Publications Referenced
SC19291400    

Fix information

  • Fixed component name

    IMS FP SOLUTION

  • Fixed component ID

    5655W1400

Applicable component levels

  • R110 PSY UK63534

       UP10/12/30 P F012

Fix is available

  • Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.

[{"Line of Business":{"code":null,"label":null},"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCV35A","label":"IMS Fast Path Solution Pack"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"1.1.0"}]

Document Information

Modified date:
14 December 2020