Fixes are available
APAR status
Closed as program error.
Error description
When enabling work area maintenance for a large hierarchy with m ultiple subprojects, many of the subproject work areas are writt en to the top-level absolute location. These are not written to their correct relative location, and some are not written at al l. Analysis reveals that this occurs when the hierarchy contains on e or more sets of subprojects that share the same name, but diff er in version and/or instance AND the 'Include project-specific directory in work area path' option is NOT selected. Messages i n the message view look like this: Setting path for work area of '?4-part project name?' to 'C:/MyDir'... The work area for '?4-part project name?' will be mainta ined automatically. Synchronizing ... Warning: Work area path is not for this project, indicat es obsolete work area for project Serious: Errors occurred during synchronization Synchronization summary: 0 Update(s) for project ?4-part project name? 0 Conflict(s) for project ?4-part project name? Warning: Errors occurred during synchronization. Check y our logs. Saved work area options for project: '?4-part project na me?' One workaround is to ensure that the 'Include project-specific d irectory in work area path' option is selected. This is a regression from the way that traditional mode performs . Using traditional mode the hierarchy gets written correctly an d is thus another workaround.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * **************************************************************** * PROBLEM DESCRIPTION: * **************************************************************** * RECOMMENDATION: * **************************************************************** Failure to write certain subprojects when a relative hierarchy contains subprojects with the same name, the project specific directory is set to false and work area path is not defined
Problem conclusion
This has been fixed in Synergy iFix 7.1.0.2.01.
Temporary fix
Comments
APAR Information
APAR number
PM18845
Reported component name
TLOGIC SYNERGY
Reported component ID
5724V66SN
Reported release
710
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2010-07-20
Closed date
2010-12-22
Last modified date
2010-12-22
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
TLOGIC SYNERGY
Fixed component ID
5724V66SN
Applicable component levels
R710 PSN
UP
[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSC6Q5","label":"Rational Synergy"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"7.1","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]
Document Information
Modified date:
22 December 2010