APAR status
Closed as program error.
Error description
If the generated cobol file is very larg ( ? 2MB) the compiler l isting is also very large. It is found that in this case the com pile may complete successfully, but the build server hangs when trying to download the listing file. User workaround is to specify no complier listing. The build server should be changed to handle the situation and p revent the hang.
Local fix
Problem summary
The listing is now broken up and sent 1Meg at a time, instead of trying to access the entire part, which caused a hang by insufficient memory available.
Problem conclusion
Software updated. Fixtest available.
Temporary fix
Comments
APAR Information
APAR number
PK97286
Reported component name
RBD EGL FOR COB
Reported component ID
5724S5001
Reported release
751
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2009-09-28
Closed date
2009-12-14
Last modified date
2009-12-14
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
RBD EGL FOR COB
Fixed component ID
5724S5001
Applicable component levels
R751 PSN
UP
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSMQ79","label":"Rational Business Developer"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"7.5.1","Edition":"","Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]
Document Information
Modified date:
14 December 2009