Error description

  • LIU Integrity Checker supports the Fast Path Advanced Tool of
    IMS High Performance Fast Path Utilities Version 3.2.
    

Local fix

  • N/A
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED: IMS Library Integrity Utilities for z/OS,    *
    *                 Version 2 Release 1 (FMID=H27P210) users     *
    *                 who use the Integrity Checker, and IMS High  *
    *                 Performance Fast Path Utilities Version 3    *
    *                 Release 2(FMID=H31A320) users who use the    *
    *                 Fast Path Advanced Tool(FPA) or IMS High     *
    *                 Performance Image Copy(HPIC) Version 4       *
    *                 Release 1(FMID=H1J0410).                     *
    ****************************************************************
    * PROBLEM DESCRIPTION: This APAR provides the following 2      *
    *                      functions.                              *
    *                                                              *
    *                      1. Integrity Checker creates RDEs       *
    *                      during a reload process of a            *
    *                      reorganization under FPA.               *
    *                                                              *
    *                      2. Under the HPIC Recovery function,    *
    *                      Integrity Checker restores a valid RDE  *
    *                      for a DEDB area and uses the RDE for    *
    *                      DMB verification.                       *
    ****************************************************************
    * RECOMMENDATION: Apply the maintenance for this APAR.         *
    ****************************************************************
    This APAR includes the following two enhancements:
    
    1. When the Fast Path Advanced Tool (FPA) of IMS High
       Performance Fast Path Utilities (HPFPU) V3.2 reorganizes a
       DEDB area with DBD change, Integrity Checker creates a new
       RDE for the reorganized area. If there is no current RDE for
       a DEDB area, Integrity Checker also creates an RDE for the
       area during reorganization by FPA.
       To use this enhancement, you need to apply APAR PK79836 for
       HPFPU V3.2.
    
    2. When the Recovery function of IMS High Performance Image Copy
       (HPIC) V4.1 performs a time-stamp recovery of a DEDB area,
       Integrity Checker restores the RDE that was valid at the
       specified recovery time and uses that RDE for DMB
       verification.
       To use this enhancement, you need to apply APAR PK69500 for
       HPIC V4.1.
    
       Additionally, if you want to enable this enhancement during
       a time stamp recovery using an image copy taken under FPA,
       you need to apply APAR PK79836 for HPFPU V3.2.
    

Problem conclusion

Temporary fix

Comments

  • ========================
    = DOCUMENTATION CHANGE =
    ========================
    IMS Library Integrity Utilities for z/OS Version 2 Release 1
    User's Guide (Document Number: SC19-2479-00) should be changed
    as follows.
    ================================================================
    Chapter 1. Overview of IMS Library Integrity Utilities
    1.5 Restrictions and considerations
    1.5.1 Integrity Checker
     Before using the following jobs to recover a database to a
     certain point of time by using an old DBD, you must recover
     the registered DMB entry(RDE) that was valid at that time.
    
    <<Delete the following description.>>
    | - Time stamp recovery jobs for a DEDB database
    
    <<Add the following new restrictions>>
    |When you reorganize a DEDB area to change DBD definition by use
    |of the Fast Path Basic Tools provided in IMS High Performance
    |Fast Path Utilities, Integrity Checker does not create an RDE
    |for the reorganized area. You need to create an RDE for the
    |reorganized area by the LICON utility before using the
    |reorganized area.
    |
    |When you extend the size of a DEDB area by use of the Online
    |Area Extender utility provided in IMS High Performance Fast
    |Path Utilities, Integrity Checker does not create an RDE for
    |the extended area. You need to create an RDE for the extended
    |area by the LICON utility before using the extended area.
    
    Considerations
    <<Add the following new considerations>>
    |When you reorganize DEDB areas to change DBD definition by
    |using the Fast Path Advanced Tool of IMS High Performance Fast
    |Path Utilities Version 3 Release 2 that has APAR PK79836
    |applied, Integrity Checker creates new RDEs for the reorganized
    |areas. If reorganization completes successfully, but Integrity
    |Checker fails to create new RDEs, you must take one of the
    |following actions:
    | - Rerun the reorganization job to create new RDEs for the
    |reorganized areas.
    | - If you decide not to rerun the reorganization job and to use
    |the original areas, you must delete the RDEs that were created
    |during the reorganization by the DELETE.DB command of the LICON
    |utility before using the areas.
    | - If you decide not to rerun the reorganization job and to use
    |the reorganized areas, you must create the RDEs whose creation
    |failed during the reorganization by the INIT.DB command of the
    |LICON utility before using the areas.
    
    Chapter 2. Integrity Checker
    2.1 Overview
    2.1.1 What is an RDE
    <<Modify the following description.>>
     How an RDE is created and maintained
    
     Integrity Checker maintains an RDE automatically in the
     following cases:
    
     - If you change a DBD and use any of the following utilities to
    |  reorganize a database or an area with the RDE, Integrity
       Checker replaces the RDE with a new one:
        - IMS HISAM Reorganization Reload Utility
        - IMS HD Reorganization Reload Utility
        - IMS Parallel Reorganization
           - IPR Driver
           - IPR Reload Utility
        - IMS High Performance Load
        - IMS Online Reorganization Facility
    |   - Fast Path Advanced Tool of IMS High Performance Fast Path
    |     Utilities V3.2
    
    |- If you run a time stamp recovery job by using the recovery
    |function of IMS High Performance Image Copy V4.1 that has APAR
    |PK69500 applied, Integrity Checker restores the RDE that was
    |valid at the specified recovery time and uses that RDE for DMB
    |verification.
    
    Chapter 10. Troubleshooting
    10.1 Messages and codes
    10.1.4 IMS LIU messages
    10.1.4.1 FABL messages
    << Add the following description about a new message. >>
    |FABL0113W LIU CONFIGURATION NOT FOUND
    |Explanation: No global option module was found. The LIU
    |Integrity Checker has not been activated.
    |System Action:  The IMS batch job continues processing without
    |the IMS LIU integrity Checker function.
    |Problem Determination: Check whether the global option module
    |is provided for the STEPLIB concatenation of the batch job.
    |Programmer Response: Supply the global option module to the
    |STEPLIB concatenation. Rerun the batch job.
    
    <<Modify the following description.>>
     FABL0212W CHECKSUM CALCULATION WAS SKIPPED FOR MODULE: mmmmmmmm
     IN {DBD: dddddddd | DBD: dddddddd AREA: aaaaaaaa}
     Explanation: IMS LIU Integrity Checker cannot calculate the
     checksum value for module mmmmmmmm that is specified in either
     ACB or DBD for non-HALDB full-function database dddddddd, HALDB
     partition dddddddd, or area aaaaaaaa of database dddddddd.
     System action: Processing continues without storing the
     checksum value for the module into RDE.
     Problem determination: Read the preceding messages that explain
    |the warning conditions. If this message is issued under the
    |Fast Path Advanced Tool of IMS High Performance Fast Path
    |Utilities, see the Considerations for using Integrity Checker
    |in the IMS High Performance Fast Path Utilities User's Guide
    |for the reason of the warning.
     Programmer response: None.
    

APAR Information

  • APAR number

    PK78962

  • Reported component name

    IMS LIBR INTEG

  • Reported component ID

    5655I4200

  • Reported release

    210

  • Status

    CLOSED UR1

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2009-01-20

  • Closed date

    2009-03-06

  • Last modified date

    2009-04-02

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  •    FABLAH0  FABLAH0A FABLAH0B FABLAH08 FABLAH09
    FABLAPID FABLAPIP FABLARCA FABLARCN FABLASCD FABLBICA FABLBICB
    FABLBIC0 FABLBIC8 FABLBIC9 FABLFBBA FABLFBBB FABLFBB0 FABLFBB9
    FABLGVT0 FABLICCA FABLICCB FABLICC0 FABLICC8 FABLICC9 FABLICI0
    FABLLINK FABLPNL  FABLRCKA FABLRCKB FABLRCK0 FABLRCK9 FABLTAPI
    FABLTC00 FABLTC10 FABLTC20 FABLTC30 FABLVDVA FABLVDVB FABLVDV0
    FABLVDV8 FABLVDV9 FABLVERS FABLVMNA FABLVMNB FABLVMN0 FABLVMN8
    FABLVMN9 FABLVRCA FABLVRCB FABLVRC0 FABLVRC8 FABLVRC9 FABLWMT
    FABUARCA FABUARCN FABURRPD H27P210J
    

Publications Referenced
SC19247900    

Fix information

  • Fixed component name

    IMS LIBR INTEG

  • Fixed component ID

    5655I4200

Applicable component levels

  • R210 PSY UK44614

       UP09/03/10 P F903

Fix is available

  • Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.

[{"Line of Business":{"code":null,"label":null},"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCX89N","label":"IMS Library Integrity Utilities"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"2.1.0"}]

Document Information

Modified date:
04 October 2020