IBM Support

PK38606: WHEN A VALID END_RBA IS SPECIFIED ON THE CONTROL CARD GGC WOULD USE THIS RBA AS AN END POINT FOR THE GGC IMAGE COPY.

A fix is available

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as new function.

Error description

  • BEFORE THIS APAR:
    When a valid RBA is specified in the END_RBA control card, GGC
    Image Copy may not reflect this specified end point.
    
    AFTER THIS APAR:
    On the GGC Utility Profile Panel, when End point "S for
    Specified" is used and a RBA value is specified in "Specified
    hex end point/Quiesce #" field (END_RBA value is specified in
    the control card for a GGC Image Copy) then the following action
    would be performed,
    If the RBA value specified on END_RBA is a valid RBA then GGC
    would use this RBA as an end point for the GGC Image Copy.
    If the RBA value specified is NOT a valid RBA then GGC would use
    the next higher valid RBA as an end point for the GGC Image
    Copy.
    If an invalid RBA (not pointing to the beginning of a DB2 LOG
    RECORD) were subsequently used, it would lead to an ABEND.  Code
    added by this APAR will validity check the user provided RBA.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED: Users of DB2 Change Accumulation Tool.       *
    ****************************************************************
    * PROBLEM DESCRIPTION: When a valid RBA is specified in the    *
    *                      END_RBA control card, GGC Image Copy    *
    *                      may not reflect this specified end      *
    *                      point.                                  *
    *                      AFTER THIS APAR:                        *
    *                      On the GGC Utility Profile Panel, when  *
    *                      End point "S for Specified" is used and *
    *                      a RBA value is specified in "Specified  *
    *                      hex end point/Quiesce #" field          *
    *                      (END_RBA value is specified in the      *
    *                      control card for a GGC Image Copy) then *
    *                      the following action would be           *
    *                      performed. If the RBA value specified   *
    *                      on END_RBA is a valid RBA then GGC      *
    *                      would use this RBA as an end point for  *
    *                      the GGC Image Copy. If the RBA value    *
    *                      specified is NOT a valid RBA then GGC   *
    *                      would use the next higher valid RBA as  *
    *                      an end point for the GGC Image Copy.    *
    ****************************************************************
    * RECOMMENDATION: APPLY the PTF.                               *
    ****************************************************************
    Code has been changed to correct this condition.
    

Problem conclusion

Temporary fix

Comments

  • APPLY the PTF.
    ×**** PE07/04/26 FIX IN ERROR. SEE APAR PK43720  FOR DESCRIPTION
    

APAR Information

  • APAR number

    PK38606

  • Reported component name

    DB2 CHANGE ACCU

  • Reported component ID

    5655F5500

  • Reported release

    140

  • Status

    CLOSED UR1

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2007-02-01

  • Closed date

    2007-02-22

  • Last modified date

    2007-05-16

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  •    GGC$BPRD GGC$BRST GGC$BUTX GGC$LPRD GGC$URCL
    GGC$URCV GGC#AMIN GGC#ASYS GGC#CARD GGC#CHKR GGC#CNTL GGC#DSPL
    GGC#ENQS GGC#ICAL GGC#LGAA GGC#LGAC GGC#LGAF GGC#LGAI GGC#LGAP
    GGC#LOGR GGC#LRDR GGC#MAIN GGC#MLOG GGC#PRNG GGC#RANG GGC#SYSC
    GGC#UPRI GGC#WRIT GGC@UREP
    

Fix information

  • Fixed component name

    DB2 CHANGE ACCU

  • Fixed component ID

    5655F5500

Applicable component levels

  • R140 PSY UK22437

       UP07/03/07 P F703

Fix is available

  • Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.

[{"Line of Business":{"code":"LOB10","label":"Data and AI"},"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSZJXP","label":"DB2 Tools for z\/OS"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"140"}]

Document Information

Modified date:
31 March 2021