A fix is available
APAR status
Closed as new function.
Error description
BEFORE THIS APAR: When a valid RBA is specified in the END_RBA control card, GGC Image Copy may not reflect this specified end point. AFTER THIS APAR: On the GGC Utility Profile Panel, when End point "S for Specified" is used and a RBA value is specified in "Specified hex end point/Quiesce #" field (END_RBA value is specified in the control card for a GGC Image Copy) then the following action would be performed, If the RBA value specified on END_RBA is a valid RBA then GGC would use this RBA as an end point for the GGC Image Copy. If the RBA value specified is NOT a valid RBA then GGC would use the next higher valid RBA as an end point for the GGC Image Copy. If an invalid RBA (not pointing to the beginning of a DB2 LOG RECORD) were subsequently used, it would lead to an ABEND. Code added by this APAR will validity check the user provided RBA.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: Users of DB2 Change Accumulation Tool. * **************************************************************** * PROBLEM DESCRIPTION: When a valid RBA is specified in the * * END_RBA control card, GGC Image Copy * * may not reflect this specified end * * point. * * AFTER THIS APAR: * * On the GGC Utility Profile Panel, when * * End point "S for Specified" is used and * * a RBA value is specified in "Specified * * hex end point/Quiesce #" field * * (END_RBA value is specified in the * * control card for a GGC Image Copy) then * * the following action would be * * performed. If the RBA value specified * * on END_RBA is a valid RBA then GGC * * would use this RBA as an end point for * * the GGC Image Copy. If the RBA value * * specified is NOT a valid RBA then GGC * * would use the next higher valid RBA as * * an end point for the GGC Image Copy. * **************************************************************** * RECOMMENDATION: APPLY the PTF. * **************************************************************** Code has been changed to correct this condition.
Problem conclusion
Temporary fix
Comments
APPLY the PTF. ×**** PE07/04/26 FIX IN ERROR. SEE APAR PK43720 FOR DESCRIPTION
APAR Information
APAR number
PK38606
Reported component name
DB2 CHANGE ACCU
Reported component ID
5655F5500
Reported release
140
Status
CLOSED UR1
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2007-02-01
Closed date
2007-02-22
Last modified date
2007-05-16
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
GGC$BPRD GGC$BRST GGC$BUTX GGC$LPRD GGC$URCL GGC$URCV GGC#AMIN GGC#ASYS GGC#CARD GGC#CHKR GGC#CNTL GGC#DSPL GGC#ENQS GGC#ICAL GGC#LGAA GGC#LGAC GGC#LGAF GGC#LGAI GGC#LGAP GGC#LOGR GGC#LRDR GGC#MAIN GGC#MLOG GGC#PRNG GGC#RANG GGC#SYSC GGC#UPRI GGC#WRIT GGC@UREP
Fix information
Fixed component name
DB2 CHANGE ACCU
Fixed component ID
5655F5500
Applicable component levels
R140 PSY UK22437
UP07/03/07 P F703
Fix is available
Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.
[{"Line of Business":{"code":"LOB10","label":"Data and AI"},"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSZJXP","label":"DB2 Tools for z\/OS"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"140"}]
Document Information
Modified date:
31 March 2021