A fix is available
APAR status
Closed as program error.
Error description
You are receiving the following DFHEC0002 when you overtype the Bundle status from from 'Enabling' to 'Enabled', DFHEC0002 A severe error (code X'3661') has occurred in module DFHECRL . The trace shows the following INVALID_TOKEN exception trace entry, AP 3661 ECRL *EXC* - INVALID_TOKEN - FUNCTION(SET) BUNDLE_TOKEN(17C6DB40 , 00000001) RESOURCE_TOKEN(17ED2BD0 , 00000001) CLIENT_TOKEN(180C7030 , 00000000) STATE(DISABLED) FUNCTION(SET) BUNDLE_NAME(........) . You did a WARM start for this CICS run. . Further investigation, found that you have received the following DFHRL0119 message prior to this run, DFHRL0119 E The CICS resource lifecycle bundle class failed to re-create the BUNDLE resource XXXXXXX because of failed consistency checks with the manifest - /usr/lpp/<your manifest file path> . Before that, you had disabled this problem bundle. . . Additional Symptom(s) Search Keyword(s): KIXREVCTC INVALID_TOKEN DFHEC0002, EC0002, DFHRL0119, RL0119
Local fix
Restart the CICS region with COLD start.
Problem summary
**************************************************************** * USERS AFFECTED: All CICS Users. * **************************************************************** * PROBLEM DESCRIPTION: When using bundles which contain EP * * parts it is possible to suffer a * * severe error x'3661' in module DFHECRL. * **************************************************************** The problem can occur should the bundle in use by the CICS region be re-exported to zfs at the same location and the CICS region is restarted. During the restart CICS finds bundles to recover but this fails the consistency checking so CICS does not recover the bundle parts. No BUNRLRS records are removed from the GCD. The bundle is then discarded, this discard should have driven RLPK DISCARD_RESOURCE to delete the GCD records for the bundle parts. However as the recovery did not actually recover the bundle parts this does not happen. The result after the discard is that the GCD still contains the BUNRLRS record. The bundle is re-installed adding another BUNRLRS record to the GCD. When CICS is again restarted it reads the GCD and recovers the 2 BUNRLRS records even though both are for the same resource. The bundle is left in an enabling state. Keywords: EVENTBINDINGS EPADPATER EPADPATERSET DFHGCD msgDFHEC0002 msgDFHRL0119
Problem conclusion
CICS has been changed to ensure should the recover of the catalog records fail consistency checking the catalog record is deleted.
Temporary fix
Comments
APAR Information
APAR number
PI96875
Reported component name
CICS TS Z/OS V5
Reported component ID
5655Y0400
Reported release
800
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2018-04-17
Closed date
2018-08-16
Last modified date
2018-09-04
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
UI57910
Modules/Macros
DFHRLBR DFHRLDM DFHRLDUF DFHRLPK1 DFHRLPM DFHRLRG1 DFHRLRO DFHRLRS1 DFHRLST
Fix information
Fixed component name
CICS TS Z/OS V5
Fixed component ID
5655Y0400
Applicable component levels
R100 PSY UI57910
UP18/08/17 P F808
Fix is available
Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSGMGV","label":"CICS Transaction Server"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"5.1","Edition":"","Line of Business":{"code":"LOB35","label":"Mainframe SW"}},{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"SG19M","label":"APARs - z\/OS environment"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"5.1","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
04 September 2018