A fix is available
APAR status
Closed as new function.
Error description
This enhancement adds to DBSP 2.1 ORF the support for adding, removing and changing compression routines for non-HALDBs. An IMS Online Change is required after the ORF job step in most cases.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: All users of IBM IMS Database Solution Pack * * V2.1 IMS Online Reorganization Facility who * * use the DBD change feature * **************************************************************** * PROBLEM DESCRIPTION: Add the support of adding, removing and * * changing compression routine. * **************************************************************** * RECOMMENDATION: * **************************************************************** Add the support of adding, removing and changing compression routine.
Problem conclusion
Temporary fix
Comments
======================== = DOCUMENTATION CHANGE = ======================== The IBM IMS Database Solution Pack for z/OS Version 2 Release 1 IMS Online Reorganization Facility User's Guide (SC19-4103-00) --------------------------------------------------------------- > IMS Online Reorganization Facility overview >> IMS Online Reorganization Facility features and benefits >>> DBD change feature >>>> Supported DBD changes COMPRTN parameters You can change all the parameters except for the fourth parameter. - The fourth parameter specifies the maximum number of bytes by which fixed-length segments can increase during compression exits. You cannot change the fourth parameter if ONLINECHANGE(Y); when you change the fourth parameter, specify ONLINECHANGE(N). - When you change the routine name, you must include both the old and new compression routines in the STEPLIB concatenation. Adding or removing a COMPRTN keyword Changing the fourth parameter of the COMPRTN keyword After reorganizing the database using the new definition, IMS Online Reorganization Facility leaves the database offline because a setting of ONLINECHANGE(N) is forced. You must manually run the Online Change Copy utility to update the inactive ACBLIB followed by a standard IMS online change, turn off the prohibit authorization flag, and then bring the database back online. --------------------------------------------------------------- > Using IMS Online Reorganization Facility >> Examples for IMS Online Reorganization Facility >>>Adding or removing a compression routine to a HIDAM database Because adding or removing a compression routine involves changes to PSBs, ONLINECHANGE(N) must be specified. After the job ends, you must perform some post-processing tasks. 1.The IMS Online Reorganization Facility job updates the staging ACBLIB with the new database definition, but it does not update the ACBs in online IMS subsystems. The job ends with return code 4, and the HIDAM database remains offline with the prohibit authorization flag turned on. 2. Use the Online Change Copy utility (DFSUOCU0) and copy the staging ACBLIB to the inactive ACBLIB. You can use the OLCUTL procedure to invoke the Online Change Copy utility. 3. Issue /MODIFY commands or INITIATE OLC commands to complete the IMS online change. 4. Turn off the prohibit authorization flag and restart the database. Related topics: See the following topics for IMS functions and utilities: - "Overview of the local online change function" in IMS System Administration - "Overview of the global online change function" in IMS System Administration - "Online Change Copy utility (DFSUOCU0)" in IMS System Utilities - "OLCUTL procedure" in IMS System Utilities ---------------------------------------------------------------- > Troubleshooting >> Messages and codes >>> Messages HRF01577E ONLINECHANGE(N) required because PSBs must be rebuilt Explanation: The specified DBD change involves changes to PSBs, which requires the ONLINECHANGE(N) keyword. System action: Processing terminates. User response: Specify ONLINECHANGE(N) and resubmit the job. After the job ends, perform any required post-processing tasks. --------- HRF01578W IMS online change is required Explanation: IMS Online Reorganization Facility updated the staging ACB library with the new database definition, but the ACBs in online IMS subsystems are not updated. System action: Processing continues. User response: Use the Online Change Copy utility to copy the ACBs from the staging ACB library to the inactive ACB library. Then perform a standard IMS online change.
APAR Information
APAR number
PI45741
Reported component name
IM DB SOLUTION
Reported component ID
5655S7700
Reported release
210
Status
CLOSED UR1
PE
NoPE
HIPER
NoHIPER
Special Attention
YesSpecatt / New Function / Xsystem
Submitted date
2015-07-27
Closed date
2015-08-21
Last modified date
2015-09-02
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
UI30422
Modules/Macros
HRFODBCM HRFOLEV0 HRFOPST3 HRFOREO0 HRFOREO8 HRFYMSGL HRFYMSGT
SC19410300 |
Fix information
Fixed component name
IM DB SOLUTION
Fixed component ID
5655S7700
Applicable component levels
R210 PSY UI30422
UP15/08/26 P F508
Fix is available
Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.
[{"Line of Business":{"code":null,"label":null},"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCV358","label":"IMS Database Solution Pack"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"2.1.0"}]
Document Information
Modified date:
23 October 2020