IBM Support

PI07609: ABENDB37-04 WITH DEDB ANALYZE UTILITY DURING VIO DATA SET ALLOCATION

A fix is available

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • DEDB analyze utility Online Pointer Checker received the
    following abend during VIO allocation:
    CODE=B37  REASON CODE=00000004
    OPC needs to be modified to better estimate DAR13SO.
    

Local fix

  • Manually adding a DAR13SO DD statement to the job specifying
    more space allows it to run to completion.
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED: All Online Pointer Checker and Online        *
    *                 Expert Reorganization users of HPFPU Fast    *
    *                 Path Online Tools in Fast Path Solution      *
    *                 Pack Version 1 Release 2 (FMID: HAHQ120).    *
    ****************************************************************
    * PROBLEM DESCRIPTION: OPC abended with B37-04 for DAR13SO DD  *
    *                      when FULLSTEP=YES and TYPRUN=RPT are    *
    *                      specified.                              *
    ****************************************************************
    * RECOMMENDATION: Apply the maintenance for this APAR.         *
    ****************************************************************
    The DAR13SO work data set can be allocated dynamically when
    . FULLSTEP=YES and TYPRUN=PTRALL/RPT are specified for OPC
    . PTRCHK=YES, FULLSTEP=YES and TYPRUN=PTRALL/RPT are specified
      for OER
    
    However, the estimation for the primary size of the DAR13SO
    work data set is too small when the average segment length
    in DBD definition is much larger than the actual average
    segment length, which caused B47.
    

Problem conclusion

  • OPC and OER have been modified to adjust the primary and
    secondary sizes for the work data sets when the calculated
    primary size is smaller than 1CYLINDER.
    

Temporary fix

Comments

APAR Information

  • APAR number

    PI07609

  • Reported component name

    IMS FP SOLUTION

  • Reported component ID

    5655W1400

  • Reported release

    120

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2013-12-06

  • Closed date

    2013-12-18

  • Last modified date

    2014-01-02

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

    UI13657

Modules/Macros

  • FPXATDC0
    

Fix information

  • Fixed component name

    IMS FP SOLUTION

  • Fixed component ID

    5655W1400

Applicable component levels

  • R120 PSY UI13657

       UP13/12/19 P F312

Fix is available

  • Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.

[{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"SG19M","label":"APARs - z\/OS environment"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"1.2.0","Edition":"","Line of Business":{"code":"","label":""}},{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCV35A","label":"IMS Fast Path Solution Pack"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"1.2.0","Edition":"","Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
02 January 2014