A fix is available
APAR status
Closed as program error.
Error description
When changing tablespace from PBR to PBG using WSL with Embed IFF into WSL turned on - the analyze job fails with RC=28 on listdsi.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: Users of Db2 Administration Tool for z/OS * **************************************************************** * PROBLEM DESCRIPTION: The ANALYZE job can fail when the * * 'Embed IFF into WSL' option is enabled, * * but no IFF file is required for the * * change. * **************************************************************** When the change that invokes UNLOAD is analyzed and no IFF file is generated for the UNLOAD, but the 'Embed IFF into WSL' option is set to YES, the ANALYZE job fails with RC=0028.
Problem conclusion
The problem has been resolved.
Temporary fix
Comments
APAR Information
APAR number
PH60204
Reported component name
DB2 ADMIN TOOL
Reported component ID
568851500
Reported release
D10
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2024-03-06
Closed date
2024-04-26
Last modified date
2024-05-01
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
UI96703
Modules/Macros
ADBGAJOB
Fix information
Fixed component name
DB2 ADMIN TOOL
Fixed component ID
568851500
Applicable component levels
RD10 PSY UI96703
UP24/04/30 P F404
Fix is available
Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSZJXP","label":"DB2 Tools for z\/OS"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"D10","Line of Business":{"code":"LOB10","label":"Data and AI"}}]
Document Information
Modified date:
02 May 2024