IBM Support

PH56115: IBM DEVELOPER FOR Z V16.0.2 - AT-TLS IVP DAEMON RETURN EOC_RSE_ZEXPLORER_RULE~242 RC: 406 INITIAL HANDSHAKE 486 ERROR

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • In IDz users run IVP (TLS enabled) for the Daemon.  The IVP
    return successfully with Exit code = 0, but it
    has error with ServerThread connection. For AT-TLS specifically,
    it returns EOC_RSE_Zexplorer_Rule~242 RC: 406
    Initial Handshake 486 error.
    
    Stack:
    0090  +FEK900I DAEMON IVP: Success
    0090  +FEK901I DAEMON IVP  Exit code = 0
    0090  EZD1287I TTLS Error RC:  406 Initial Handshake 486
    0090    LOCAL: ::ffff:x.xx.xxx.xxx..59000
    0090    REMOTE: ::ffff:x.xx.xxx.xxx..7736
    0090    JOBNAME: B620006 RULE: rule_rse_server
    0090    USERID: xxxx032 GRPID: 00000005 ENVID: 0000003D CONNID:
    0000AF34
    
    Workaround:
    None
    

Local fix

  • NA
    

Problem summary

  • In the second step connecting to ServerThread, IVP Daemon does
    not configure the gsk environment properly, causing the
    handshake and the connection failed.
    The first step in the test to connect to Daemon is working fine.
    

Problem conclusion

  • IVP Daemon does not set up the gsk environment properly for the
    ServerThread connection test, causing the handshake and test
    failure. In AT-TLS mode, it was logged explicitly in syslog with
     the TTLS 406 error.
    By preparing a correct gsk environment for the ServerThread
    connection, the handshake and the connection to the ServerThread
    port is fine.
    

Temporary fix

Comments

APAR Information

  • APAR number

    PH56115

  • Reported component name

    Z/OS EXPLORER E

  • Reported component ID

    5724T0723

  • Reported release

    330

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2023-07-31

  • Closed date

    2023-10-19

  • Last modified date

    2023-10-19

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    EXP FOR Z/OS HO

  • Fixed component ID

    5655EXP23

Applicable component levels

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSBDYH","label":"IBM Explorer for z\/OS"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"330","Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]

Document Information

Modified date:
20 October 2023