APAR status
Closed as program error.
Error description
JCL Build generate Syntax error: 'error in collecting semantics
Local fix
n/a
Problem summary
A syntax error was thrown when collecting semantic information from a JCL program (Syntax error: 'error in collecting semantics in xxxxxxxxxxxxx'
Problem conclusion
A memory violation occurred during collecting semantic information, due to a poorly set condition for a previous fix (-on v.6.1.1), so the condition was set correctly in the C++ code.
Temporary fix
Comments
APAR Information
APAR number
PH55243
Reported component name
APPL DISCOVERY
Reported component ID
5737B1600
Reported release
611
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2023-06-18
Closed date
2023-07-30
Last modified date
2023-07-30
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
APPL DISCOVERY
Fixed component ID
5737B1600
Applicable component levels
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSRR9Q","label":"IBM Application Discovery"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"611","Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]
Document Information
Modified date:
30 July 2023