APAR status
Closed as suggestion for future release.
Error description
After upgrading from CA11.0.13 to CA11.1.7 FP5, cogaudit.log backup(gz file) is created daily at midnight. The cogaudit.log backup creation should be controlled by Cognos Configuration. There are "Maximum size of log file in MB" and "Maximum number of full log files" in Cognos Configuration regarding cogaudit.log settings. But their values cannot control the cogaudit.log backup(gz file) creation.
Local fix
Problem summary
Problem conclusion
Temporary fix
Comments
This is not a product defect; an idea (enhancement) has been created. If you are interested in this Idea and would like to see it implemented in a future release please visit the Idea site (click on the link) and be sure to up vote it. https://ibm-data-and-ai.ideas.ibm.com/ideas/CA-I-3919
APAR Information
APAR number
PH50155
Reported component name
COGNOS ANALYTIC
Reported component ID
5724W12XX
Reported release
B0A
Status
CLOSED SUG
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2022-10-12
Closed date
2023-01-31
Last modified date
2023-01-31
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Applicable component levels
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSTSF6","label":"Cognos Analytics"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"B0A","Line of Business":{"code":"LOB10","label":"Data and AI"}}]
Document Information
Modified date:
01 February 2023