APAR status
Closed as program error.
Error description
CA-7 job triggering flow graphs are loading slowly. The symptoms is that to bring up a list of schedule IDs to select before the graph is created, it takes about 11 minutes. After selecting the schedule ID and creating the graph it takes about 10 minutes to show the graph.
Local fix
Problem summary
When the user wants to create a CA-7 job triggering flow graph he can notice that the wizard to choose the schedule id and the graph itself takes very long time.
Problem conclusion
It was discovered that in case the database contains many jobs the stored procedures that calculate the available schedule ids and the graph, validated the data only after collecting all combinations of records (invalid as well as valid). The solution is to prevalidate while collecting all combinations so that the final validations and schedule id calculation runs on fewer records.
Temporary fix
Comments
APAR Information
APAR number
PH38121
Reported component name
APPL DISCOVERY
Reported component ID
5737B1600
Reported release
510
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2021-06-15
Closed date
2021-06-15
Last modified date
2021-06-15
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
None 999
Fix information
Fixed component name
APPL DISCOVERY
Fixed component ID
5737B1600
Applicable component levels
[{"Line of Business":{"code":"LOB10","label":"Data and AI"},"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSRR9Q","label":"IBM Application Discovery"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"510"}]
Document Information
Modified date:
16 June 2021