IBM Support

PH30986: JCL COMPILER

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as fixed if next.

Error description

  • After performing some tests, it seems to be an issue related to
    JCL compiler. Indeed, on //@SASBSTR.SYSIN DD
    DSN=&BASEOS.DATA(BB&BNK.S3601),DISP=SHR line from BB#S365D PROC,
     the &BASEOS symbol is not replaced. The &BNK symbol between the
     parentheses is replaced properly, but not the &BASEOS symbol,
    despite the fact that it has the value assigned above. In order
    to see the problem, perform 'Dataset Usage in Jobs' analyze.
    

Local fix

  • N/A
    

Problem summary

  • Problem summary: JCL compiler - symbols are not resolved as
    expected during compilation
    Problem conclusion: fixed with code changes related to how the
    JCL compiler identifies symbols and assigns values to them
                                      (such as in the case of a data
    set name coded as a symbolic parameter - e.g. DSN=&xxxxxxxx).
    

Problem conclusion

Temporary fix

Comments

APAR Information

  • APAR number

    PH30986

  • Reported component name

    APPL DISCOVERY

  • Reported component ID

    5737B1600

  • Reported release

    510

  • Status

    CLOSED FIN

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2020-10-28

  • Closed date

    2021-06-22

  • Last modified date

    2021-06-22

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

Applicable component levels

[{"Line of Business":{"code":"LOB10","label":"Data and AI"},"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSRR9Q","label":"IBM Application Discovery"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"510"}]

Document Information

Modified date:
23 June 2021