A fix is available
APAR status
Closed as program error.
Error description
The BPM profiles are set up with secured messaging buses while the different JMS resources associated with the bus default to using secured and unsecured inbound communication chains. The additional unsecured configuration causes unnecessary overhead as unnecessary lookups are performed and fail. Also, when a Deployment Environment was extended with additional nodes, the messaging endpoints did not reflect the new cluster members and these entries must be added manually which can be problematic and tedious. Finally when using Process Designer in a ND environment, the trust store was not correct for the cell and end-users of Process Designer would be prompted to accept SSL certificates. Includes internal defects 68046, 68048, and 68050
Local fix
N/A
Problem summary
**************************************************************** * USERS AFFECTED: IBM Business Process Manager 7.5.1 * * Stand-alone and Network Deployment * * Topologies * **************************************************************** * PROBLEM DESCRIPTION: Trust store password did not match * * properties in Process Designer and * * connection factory properties were * * not updated. * **************************************************************** * RECOMMENDATION: Apply this fix along with JR42441 or * * JR42442 to solve issue with trust store * * file with incorrect password not * * specified or the connection factory * * endpoints specified incorrectly. * **************************************************************** The trust store that was included with Process Designer was only from the node scope and the password for the store was note compatible for the property values specified in Process Designer. Also the inbound transport chain was not updated when members were added to a cluster.
Problem conclusion
The fix provides the base support for JR42441 to fix the issue with only the node scoped trust store file included with Process Designer. It also provies the base support for JR42442 to fix the issue with adding additional ports of new cluster members to the inbound transport chain of connection factory resources.
Temporary fix
Comments
APAR Information
APAR number
JR42121
Reported component name
BPM STANDARD
Reported component ID
5725C9500
Reported release
751
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2012-03-01
Closed date
2012-04-10
Last modified date
2012-04-10
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
BPM STANDARD
Fixed component ID
5725C9500
Applicable component levels
R750 PSY
UP