APAR status
Closed as suggestion for future release.
Error description
Checking direct issue box in planned materials didn't affect the PR quantity. Ensure your multisite edit settings allow changes to Work Plan Materials when the work order is approved. 1. Create a work order with an inventory item in the work plan materials. 2. Check Item Availability for the item and record the number of reservations(quantity ordered in workorder should more than Item Available so system can generate pr after workorder approval). 3. Approve the work order. 4. Check Item Availability again; reserved quantity should have gone up. System generate reorder. PR created. 5. Tick Direct Issue check box and save. Reservation disappear. Correct.But it didn't clear the PR generated in point 3 (Stock item PR). Purchasing team will have big question if Reorder PR generated without a correct reservation. Maximo 5.2 Patch08 a follow up problem of issue 06-15424
Local fix
NA
Problem summary
Problem conclusion
Temporary fix
Comments
Development recommded that this be considered an enhancement request.
APAR Information
APAR number
IZ36535
Reported component name
WORK ORDER TRAC
Reported component ID
5724R46WO
Reported release
520
Status
CLOSED SUG
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2008-11-03
Closed date
2008-11-19
Last modified date
2008-11-19
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Applicable component levels
[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCHPPU","label":"Work Order Tracking"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"520","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
19 November 2008