When the user does a Commit, a Refresh or opens the Change Status dialog box in Graphical Scheduling this SQL select is run several times, sometimes we have seen it 5 times in the logs: select count(*) from wplabor wl, skdactivity act where wl.craft is not null and act.id = ('WORKORDER_' || wl.wonum || '_' || wl.siteid || '_' || wl.orgid) and wl.orgid = 'EAGLENA'and (act.objectid) in (select workorderid from workorder where wonum=wl.wonum and workorderid = act.objectid and act.skdprojectid = 287 and act.objectname = 'WORKORDER') and wl.wplaboruid not in (select objectid from skdreservation where skdprojectid = 287 and objectname = 'WPLABOR') In one case it took over 10 seconds each time it ran so in the end over 30 seconds was spent running this one select. We should change the Scheduler to run it only one time. We should save the results if other parts of the function (Commit, Refresh or opening the Change Status dialog) need to use those results again. Steps to reproduce: 1. Turn on Logging so you can see how often this select is run. Usually in the Logging application I set: SCHEDULER to Log Level DEBUG SCHEDULERSQLto Log Level DEBUG 'sql' to Log Level INFO 2. Save your Logging settings and Apply Changes. 3. Open any Schedule in Graphical Scheduling (GS) or create one. 4. Click on the Gantt View tab. 5. Choose either Change Status, Refresh Schedule or Commit Changes from the Common Actions menu. 6. Note the time you did number 5. 7. When it is done, gather the SystemOut logs and search for "from wplabor" and see how many times you find the SELECT COUNT (*) FROM WPLABOR in the log. You will see if several times. That is the problem, it should be in the log only one time. Or perhaps we do not even need to run this select at all. The was found in 7.6.0.5, reproduced in 7.6.0.6 and development says it is in all versions, even 7.6.0.9 being developed now.
Local fix
(none)
Problem summary
**************************************************************** * USERS AFFECTED: * * maximo scheduler users * **************************************************************** * PROBLEM DESCRIPTION: * * When the user does a Commit, a Refresh or opens the Change * * Status dialog box in Graphical Scheduling this SQL select is * * run several times, sometimes we have seen it 5 times in the * * logs * **************************************************************** * RECOMMENDATION: * * Apply fixpack Release 7.6.0.9 of Base Services or request * * an interim fix * ****************************************************************
Problem conclusion
Fix has been made to fix....The fix for this APAR is contained in the following maintenance package: | release\fix pack\interim fix for Release 7.6.0.9 of Base Services
Temporary fix
Comments
APAR Information
APAR number
IV98839
Reported component name
MAXIMO SCHEDULE
Reported component ID
5724R46SE
Reported release
763
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2017-08-08
Closed date
2017-08-11
Last modified date
2017-08-11
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
MAXIMO SCHEDULE
Fixed component ID
5724R46SE
Applicable component levels
R763 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"763","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
11 August 2017