APAR status
Closed as documentation error.
Error description
The IBM Spectrum Protect Plus documentation for repairing failed vSnap servers is missing instructions for obtaining ssh keys and TLS certificate. Which is needed for adding the vSnap partner. Step 8 needs to be updated with instructions in getting the TLS certificate from vSnap2 and the SSH keys from vSnap1 and vSnap2. Step 9 needs to be updated with instructions for the vSnap partner add command with the results from step 8. IBM Spectrum Protect Plus Versions Affected: IBM Spectrum Protect Plus 10.1.13.x
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * IBM Spectrum Protect Plus 10.1.13, 10.1.14, and 10.1.15 * **************************************************************** * PROBLEM DESCRIPTION: * * See Error Description * **************************************************************** * RECOMMENDATION: * * Apply the fixing level when available. This problem is * * currently projected to be fixed in IBM Spectrum Protect Plus * * version 10.1.16. Note that this is subject to change at the * * discretion of IBM. * ****************************************************************
Problem conclusion
When vSnap servers fail, the topics in IBM Documentation does not have sufficient information to repair the vSnap servers. The topics have missed steps about collecting the SSH host keys and TLS certificate, which are required to specify along with a username and password in the subsequent steps of procedure. So, we have added a new step 8, and updated step 9 and 10 in the procedure to provide the required additional information. This updated information will be published with the upcoming release for IBM Spectrum Protect Plus 8.1.16 in the following topic URLs: https://www.ibm.com/docs/en/spp/10.1.16?topic=tvs-how-do-i-repai r-failed-source-vsnap-in-spectrum-protect-plus-environment https://www.ibm.com/docs/en/spp/10.1.16?topic=tvs-how-do-i-repai r-failed-dual-role-vsnap-in-spectrum-protect-plus-environment https://www.ibm.com/docs/en/spp/10.1.16?topic=tvs-how-do-i-repai r-failed-target-vsnap-in-spectrum-protect-plus-environment
Temporary fix
Comments
APAR Information
APAR number
IT45087
Reported component name
SP PLUS
Reported component ID
5737SPLUS
Reported release
A1E
Status
CLOSED DOC
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2023-12-05
Closed date
2024-01-12
Last modified date
2024-01-12
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Applicable component levels
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSNQFQ","label":"IBM Spectrum Protect Plus"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A1E","Line of Business":{"code":"LOB26","label":"Storage"}}]
Document Information
Modified date:
12 January 2024