APAR status
Closed as program error.
Error description
When a VMware backup job runs and fails against a VM during the discovery phase. But then continues to complete backup of another VM. The job finishes with incorrect, completed, status and incorrectly states 0 Vms failed. Job log messages: DETAIL,[<timestamp>],2,CTGGA0062,Discovering virtual machines that need to be protected ERROR,[<timestamp>],2,CTGGA2401,Hypervisor VM [<VMName>] skipped because hypervisor [<VcenterServer>] is not loaded. Error: Failed to connect to hypervisor [<VcenterServer>]. The credentials provided are invalid SUMMARY,[<timestamp>],2,CTGGA0071,Total VMs protected: 1 failed: 0. Total transfer size: # B; Throughput: # B/Sec; Duration # second(s) INFO,[<timestamp>],,CTGGA0527,Overall Job Status COMPLETED SUMMARY,[<timestamp>],,CTGGA2384,VM: [<VMName>]; Proxy: null; vSnaps: null; Type: Incremental; Transport: null; Transferred: null; Throughput: # B/s; Queue Time: # second; Protected VMDKs: # of #; Status: failed SUMMARY,[<timestamp>],,CTGGA2384,VM: [<VMName>]; Proxy: [<ProxyServer>]; vSnaps: [<VsnapServer>]; Type: Incremental; Transport: ; Transferred: # B; Throughput: # B/s; Queue Time: # second; Protected VMDKs: # of #; Status: complete SUMMARY,[<timestamp>],,CTGGA2340,Job policy [<SLA_Name>] completed in # min(s) # sec(s) and ended with status COMPLETED. id ########## IBM Spectrum Protect Plus Versions Affected: IBM Spectrum Protect Plus 10.1.X
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * IBM Spectrum Protect Plus level 10.1.6 till 10.1.15 * **************************************************************** * PROBLEM DESCRIPTION: * * See Error Description * **************************************************************** * RECOMMENDATION: * * Apply the fixing level when available. This problem is * * currently projected to be fixed in IBM Spectrum Protect Plus * * level 10.1.16. Note that this is subject to change at the * * discretion of IBM. * ****************************************************************
Problem conclusion
The problem here was with the VM selection logic when the backup runs, it did not pass the skipped VM to the further steps in backup job. This resulted in incorrect backup result and VM count. This wrong behavior is now fixed.
Temporary fix
Comments
APAR Information
APAR number
IT44872
Reported component name
SP PLUS
Reported component ID
5737SPLUS
Reported release
A1A
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2023-10-31
Closed date
2023-11-23
Last modified date
2023-11-23
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
SP PLUS
Fixed component ID
5737SPLUS
Applicable component levels
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSNQFQ","label":"IBM Spectrum Protect Plus"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A1A","Line of Business":{"code":"LOB26","label":"Storage"}}]
Document Information
Modified date:
01 February 2024