IBM Support

IT42701: DB2 BACKUP ON CLUSTER MIGHT FAIL WITH ENABLED TRANSPORT ENCRYPTION

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • IBM Spectrum Protect Plus Db2 Database backup might fail in a
    clustered environment, if transport encryption is enabled in the
    vSnap server.
    
    The operation reports errors as follows:
    
    Error   CTGGH0117    [example.server.com] Error encountered in
    the Db2 ACS interface An error occured while interacting with
    the Db2 ACS interface.
    Error   CTGGH0180    [example.server.com] Timeout on sending ACS
    completion message for partition 2
    
    Affected versions: IBM Spectrum Protect Plus 10.1.13
    

Local fix

  • Increase the timeout by adding "Db2ACSReadyTimeout=240" to the
    /etc/guestapps.conf file. As sample file looks like this:
      more /etc/guestapps.conf
      [db2]
      Db2ACSReadyTimeout=240
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * IBM Spectrum Protect Plus level 10.1.13                      *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * see ERROR Description                                        *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Apply the fixing level when available. This problem is       *
    * currently projected to be fixed in IBM Spectrum Protect Plus *
    * levels 10.1.13.1 and 10.1.14. Note that this is subject to   *
    * change at the discretion of IBM.                             *
    ****************************************************************
    

Problem conclusion

  • The default Db2 ACS read timeout has been increased to 240 sec
    so that the backup operation should succeed.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IT42701

  • Reported component name

    SP PLUS

  • Reported component ID

    5737SPLUS

  • Reported release

    A1D

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2022-12-13

  • Closed date

    2023-01-31

  • Last modified date

    2023-01-31

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • Apps     DB2
    

Fix information

  • Fixed component name

    SP PLUS

  • Fixed component ID

    5737SPLUS

Applicable component levels

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSNQFQ","label":"IBM Spectrum Protect Plus"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A1D","Line of Business":{"code":"LOB26","label":"Storage"}}]

Document Information

Modified date:
01 February 2024