Error description
The backup operation of OpenShift CSI PVC to vSnap fails because the CSI driver sets restoreSize to 0. To set the restoreSize to zero is not tolerated by IBM Spectrum Protect Plus. In the job log you might see the following error: CTGGK3057,[10.88.2.108] The restore operation failed due to (422) Reason: Unprocessable Entity spec.resources[storage]: Invalid value: \"0\": must be greater than zero" IBM Spectrum Protect Plus Versions Affected:? 10.1.5 and later Additional Keywords: TS006368921 restoreSize Hitachi CSI PVC SPP SPPLUS PLUS
Local fix
None Available
Problem summary
**************************************************************** * USERS AFFECTED: * * IBM Spectrum Protect Plus Container Backup Support level * * 10.1.5, 10.1.6, 10.1.7, 10.1.8 on OpenShift and Kubernetes * * environments. * **************************************************************** * PROBLEM DESCRIPTION: * * see ERROR description * **************************************************************** * RECOMMENDATION: * * Apply fixing level when available. This problem is currently * * projected to be fixed in Spectrum Protect Plus Container * * Backup Support levels 10.1.9. * * Note that this is subject to change at the discretion of IBM * * * ****************************************************************
Problem conclusion
The status.restoreSize field of the VolumeSnapshot is checked for a value of zero and the PVC size is used instead.
Temporary fix
Comments
APAR Information
APAR number
IT38585
Reported component name
SP PLUS
Reported component ID
5737SPLUS
Reported release
A18
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2021-10-04
Closed date
2021-11-10
Last modified date
2021-11-10
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
k8s ocp
Fix information
Fixed component name
SP PLUS
Fixed component ID
5737SPLUS
Applicable component levels
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSNQFQ","label":"IBM Spectrum Protect Plus"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A18","Line of Business":{"code":"LOB26","label":"Storage"}}]
Document Information
Modified date:
31 January 2024