APAR status
Closed as program error.
Error description
The IBM Spectrum Protect Plus replication job incorrectly ends in failed status when only Microsoft SQL or Exchange logs are replicated. The replication job will only have logs to replicate when it runs more frequently than the scheduled database backups and less frequently than the backups of the logs. For example databases are set to be saved once a day, logs every 30 minutes and replication twice a day. Example of a job log showing a failed replication job: SUMMARY,<id>,<time>,,CTGGA2398,Starting job for policy <sla_name> (ID:1051). id -> 1605776903244. IBM Spectrum Protect Plus version 10.1.x.y INFO,<id>,<time>,,CTGGA2348,This job will protect application server(s). INFO,<id>,<time>,,CTGGA2349,This job contains at least two types of tasks: job resolution and protection. DETAIL,<id>,<time>,2,CTGGA0803,Starting Replication task 2. ... WARN,<id>,<time>,2,CTGGA0289,Skipping volume spp_volume_id_1 because there are no new snapshots since last backup WARN,<id>,<time>,2,CTGGA0289,Skipping volume spp_volume_id_2 because there are no new snapshots since last backup WARN,<id>,<time>,2,CTGGA0289,Skipping volume spp_volume_id_3 because there are no new snapshots since last backup ... SUMMARY,<id>,<time>,2,CTGGA0398,Total data replicated for job 119.14 MB; Throughput: 767.33 KB/Sec; Duration 0H:02M:38S ... ERROR,<id>,<time>,2,CTGGA1984,Total number of databases not replicated by this job:13/13 Above job log shows no databases were replicated, but a certain amount of data was replicated. Logs were replicated successfully and can be used for database log restore. IBM Spectrum Protect Plus Versions Affected: IBM Spectrum Protect Plus 10.1.x Initial Impact: Medium Additional Keywords: SPP, SPPlus, TS004535410
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * IBM Spectrum Protect Plus levels 10.1.x. * **************************************************************** * PROBLEM DESCRIPTION: * * See Error Description. * **************************************************************** * RECOMMENDATION: * * Apply the fixing level when available. This problem is * * currently projected to be fixed in IBM Spectrum Protect Plus * * levels 10.1.7 ifix2 and 10.1.8. Note that this is subject to * * change at the discretion of IBM. * ****************************************************************
Problem conclusion
The Replication job status is changed from FAILED to PARTIAL for the following two situations: 1. Only log volumes are replicated. 2. There are no new snapshots to replicate.
Temporary fix
Comments
APAR Information
APAR number
IT35795
Reported component name
SP PLUS
Reported component ID
5737SPLUS
Reported release
A16
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2021-02-04
Closed date
2021-02-12
Last modified date
2021-02-12
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
SP PLUS
Fixed component ID
5737SPLUS
Applicable component levels
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSNQFQ","label":"IBM Spectrum Protect Plus"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A16","Line of Business":{"code":"LOB26","label":"Storage"}}]
Document Information
Modified date:
31 January 2024