IBM Support

IT34234: LONG DELAY BETWEEN END OF DATA TRANSFER AND ACTUAL OFFLOAD COPY JOB COMPLETION

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • Depending on the amount of data to copy, the IBM Spectrum
    Protect Plus copy of snapshots to secondary backup storage job
    can display a long delay (from a few minutes to more than one
    hour) between end of the data transfer and the actual job
    completion.
    Here an example :
    
    SUMMARY,,<dd mm yyyy> 10:48:47
    CEST,,CTGGA2399,Starting job for policy SPPOFFLOAD with job
    name <SLAName> (ID:xxxx). id -> 1234567891234. IBM Spectrum
    Protect Plus version 10.1.5-2218.
    ... <dd mm yyyy>
    SUMMARY,,<dd
    mm yyyy> 14:31:32 CEST,2,CTGGA0399,Total data copied to cloud
    for job xx TB; Throughput: yyy MB/Sec; Duration 3H:42M:45S
    
    DETAIL,,<dd mm yyyy> 14:31:33 CEST,2,CTGGA2327,Downloading
    storage logs for storage servers [<vSnap servers used for the
    job>]
     DETAIL,,<dd mm yyyy> 14:31:34 CEST,2,CTGGA1658,Completed
    download of storage logs
    SUMMARY,,<dd mm yyyy> 15:29:15
    CEST,2,CTGGA0073,Total VMs copied to cloud : zzz failed: 0.
    Duration 4 hour(s) 40 min(s) 28 second(s)
    SUMMARY,,<dd mm yyyy>
    15:29:15 CEST,,CTGGA2340,Job policy <SLAName> completed in 4
    hr(s) 40 min(s) 28 sec(s) and ended with status COMPLETED. id
    1234567891234
    
    This delay is seen because of an internal
    synchronization process that must run before the job can be
    completed.
    
    IBM Spectrum Protect Plus Versions Affected:
    IBM
    Spectrum Protect Plus 10.1.5 and higher
    
    Initial Impact:
    Medium
    
    Additional Keywords: SPP, SPPLUS, TS004175516, delay,
    duration, long
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * IBM Spectrum Protect Plus level 10.1.5 and 10.1.6.           *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * See ERROR DESCRIPTION                                        *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Apply the fixing level when available. This problem is       *
    * currently projected to be fixed in IBM Spectrum Protect Plus *
    * level 10.1.7. Note that this is subject to change at the     *
    * discretion of IBM.                                           *
    ****************************************************************
    

Problem conclusion

  • The delay was caused by some synchronization code during the
    cataloging process at the end of the job. The problem has been
    resolved by improving the synchronization logic to minimize the
    delay.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IT34234

  • Reported component name

    SP PLUS

  • Reported component ID

    5737SPLUS

  • Reported release

    A16

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2020-09-16

  • Closed date

    2020-11-13

  • Last modified date

    2020-11-19

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    SP PLUS

  • Fixed component ID

    5737SPLUS

Applicable component levels

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSNQFQ","label":"IBM Spectrum Protect Plus"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A16","Line of Business":{"code":"LOB26","label":"Storage"}}]

Document Information

Modified date:
31 January 2024