IBM Support

IT33304: MULTIPLE ENABLELOGBACKUP/DISABLELOGBACKUP COMMANDS INVOKED AT SAME TIME MAY CORRUPT THE INPUT.JSON IN SCHEDULER

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • IBM Spectrum Protect Plus for Microsoft Exchange will update the
    input.json in job log scheduler in the enablelogbackup or
    disablelogbackup command. In the original code, we did not
    synchronize the enablelogbackup / disablelogbackup commands. So
    if multiple enablelogbackup /disablelogbackup commands invoked
    on same scheduler at same time, the input.json of this scheduler
    may be corrupted.
    

Local fix

  • For enablelogbackup problem, user can modify the log backup
    start time or frequency on GUI, run backup job, modify the start
    time or frequency back, run backup job again. This will correct
    the input.json of scheduler.
    
    For disablelogbackup problem, user can try to enable logbackup
    of the databases with different start time or frequency, run
    backup job, then disabble lobackup for these databases and run
    backup job again. This will correct the input.json of scheduler.
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * IBM Spectrum Protect Plus level 10.1.3, 10.1.4, 10.1.5,      *
    * 10.1.6                                                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * see error description                                        *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Apply fixing level when available. This problem is currently *
    * projected to be fixed in IBM Spectrum Protect Plus 10.1.7.   *
    * Note that this is subject to change at the discretion of     *
    * IBM.                                                         *
    ****************************************************************
    

Problem conclusion

  • When multiple enablelogbackup / disablelogbackup commands modify
    same logbackup scheduler at same time, the input.json of the
    logbackup scheduler may be corrupted.
    To fix this, we need to synchronize the enablelogbackup /
    disablelogbackup commands.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IT33304

  • Reported component name

    SP PLUS

  • Reported component ID

    5737SPLUS

  • Reported release

    A16

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2020-06-23

  • Closed date

    2020-09-14

  • Last modified date

    2020-09-14

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    SP PLUS

  • Fixed component ID

    5737SPLUS

Applicable component levels

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSNQFQ","label":"IBM Spectrum Protect Plus"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A16","Line of Business":{"code":"LOB26","label":"Storage"}}]

Document Information

Modified date:
31 January 2024