APAR status
Closed as program error.
Error description
When a VM is being backed up by another SLA you will see a message similar to the following and the entire backup job will fail: The job <job name> failed because one or more jobs are currently backing up the virtual machines
Local fix
Run the SLAs at different times or only have the VM in one SLA
Problem summary
**************************************************************** * USERS AFFECTED: * * IBM Spectrum Protect Plus level 10.1.5 * **************************************************************** * PROBLEM DESCRIPTION: * * See ERROR DESCRIPTION * **************************************************************** * RECOMMENDATION: * * Apply fixing level when available. This problem is currently * * projected to be fixed in IBM Spectrum Protect Plus level * * 10.1.5.2204 and 10.1.6. Note that this is subject to change * * at the discretion of IBM. * ****************************************************************
Problem conclusion
The entire VMware or Hyper-V backup job was being marked failed if a VM was being backed up at the same time in another SLA that was already in progress. The fix is to just skip the VM already in progress.
Temporary fix
Comments
APAR Information
APAR number
IT32446
Reported component name
SP PLUS
Reported component ID
5737SPLUS
Reported release
A15
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2020-04-03
Closed date
2020-05-18
Last modified date
2020-05-18
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
SP PLUS
Fixed component ID
5737SPLUS
Applicable component levels
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSNQFQ","label":"IBM Spectrum Protect Plus"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A15","Line of Business":{"code":"LOB26","label":"Storage"}}]
Document Information
Modified date:
31 January 2024