Error description
When the instant access restore of a single disk from a VM completed successfully and a subsequent 'make permanent' operation failed, the cloned vSnap volume might fail to cleanup under certain circumstances. One example when this issue can be seen is a full destination datastore where the disk is moved to. When running vsnap volume show on the vsnap host, the following can be seen: ID | TYPE | POOL | IS CLONE | TOTAL | FREE ... ---------------------------------------------------------- 1 | filesystem | 1 | No | 168.00TB | 157.00TB... 2 | filesystem | 1 | No | 168.00TB | 157.00TB... 44 | filesystem | 1 | Yes | 168.00TB | 157.00TB... 46 | filesystem | 1 | Yes | 168.00TB | 157.00TB... As seen in above extract, volume 44 and 46 are cloned volumes, used for a restore operation. Looking in the Joblog from the failed restore job, the volume that is not expected can be identified: DETAIL,1583251642436,Tue 3 Mar 2020 17:07:22 CET,2,CTGGA1307,Mounted volume (SPP_1067_1583747580145_00_spp_1019_2103_16d1f751688__group0_70_ ) to NFS path (/vsnap/vpool1/fs44) The NFS path holds the vSnap ID that failed the cleanup. The Joblog does however not show any failure or other reference trying to remove the volume. IBM Spectrum Protect Plus Versions Affected: IBM Spectrum Protect Plus 10.1.x Initial Impact: Medium Additional Keywords: SPP, SPPlus, TS003454504
Local fix
Identify the cloned volume that is not needed any more. Run following on the vSnap: vsnap volume delete --id <id from cloned volume> --force Running with the force option will also cleanup any left over NFS shares.
Problem summary
**************************************************************** * USERS AFFECTED: * * IBM Spectrum Protect Plus level 10.1.5 * **************************************************************** * PROBLEM DESCRIPTION: * * See ERROR DESCRIPTION * **************************************************************** * RECOMMENDATION: * * Apply fixing level when available. This problem is currently * * projected to be fixed in IBM Spectrum Protect Plus level * * 10.1.5.2199 and 10.1.6. Note that this is subject to change * * at the discretion of IBM. * ****************************************************************
Problem conclusion
For some vMotion or VM migrate failure conditions the job was marked failed instead of resource active. When it is resource active there will be an option to retry or cleanup.
Temporary fix
Comments
APAR Information
APAR number
IT32164
Reported component name
SP PLUS
Reported component ID
5737SPLUS
Reported release
A10
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2020-03-23
Closed date
2020-04-01
Last modified date
2020-04-01
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
SP PLUS
Fixed component ID
5737SPLUS
Applicable component levels
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSNQFQ","label":"IBM Spectrum Protect Plus"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A10","Line of Business":{"code":"LOB26","label":"Storage"}}]
Document Information
Modified date:
31 January 2024