Direct link to fix
APAR status
Closed as program error.
Error description
Rollup reports are taking several hours when the Spectrum Control environment is really large An example of large environment: Spectrum Control instance 1 having approx 85 storage systems, 45 FC switches, 5000+ hypervisors and 1900 agentless servers. The 2nd Spectrum Control instance is smaller with about 70 storage systems, 30 switches, no hypervisors and 1800 agentless servers This sized environment may find in the probe logs of the rollup server job that the collection of "Computer systems" takes about several hours
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * IBM Spectrum Control users using rollup reporting * **************************************************************** * PROBLEM DESCRIPTION: * * When rollup reports are used, and the Spectrum Control * * environment is really large, the rollup reports are taking * * several hours to perform. * * * * An example of large environment: * * * * Spectrum Control instance 1 having approx 85 storage * * systems, 45 FC switches, 5000+ hypervisors and 1900+ * * agentless servers. * * * * The 2nd Spectrum Control instance is smaller with about * * 70 storage systems, 30 switches, no hypervisors and * * approx 1800 agentless servers * * * * This sized environment may find in the probe logs of the * * rollup server job that the collection of "Computer systems" * * takes about several hours. * **************************************************************** * RECOMMENDATION: * * Apply fix maintenance when available * ****************************************************************
Problem conclusion
The fix for this APAR is targeted for the following release: IBM Spectrum Control 5.3.1 | 5.3.1-IBM-SC ( release target Nov 2018 ) http://www.ibm.com/support/docview.wss?&uid=swg21320822 The target dates for future releases do not represent a formal commitment by IBM. The dates are subject to change without notice.
Temporary fix
Comments
APAR Information
APAR number
IT23334
Reported component name
TPC
Reported component ID
5608TPC00
Reported release
529
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2017-11-29
Closed date
2018-10-10
Last modified date
2018-10-10
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
TPC
Fixed component ID
5608TPC00
Applicable component levels
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSWFB4","label":"IBM Spectrum Control Standard Edition"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"529","Line of Business":{"code":"LOB26","label":"Storage"}}]
Document Information
Modified date:
06 September 2023