Fixes are available
APAR status
Closed as program error.
Error description
The upgrade from 5.2.11 to 5.2.12 is hanging at the following delete: (see in the lax* file or traceTPCInstall.log) DELETE FROM T_RELATIONSHIP_DATA_STORE WHERE (ID, DEVICE_ID, REL_TYPE, REL_ID) IN (SELECT R.ID, R.DEVICE_ID, R.REL_TYPE, R.REL_ID FROM T_RELATIONSHIP_DATA_STORE R JOIN T_TEMP_CLEAN_LDID C ON R.ID = C.LDID_TO_DELETE OR R.ID = C.LDID_TO_REMAIN) AND (ID, DEVICE_ID, REL_TYPE, REL_ID) NOT IN (SELECT MIN(R.ID), R.DEVICE_ID, R.REL_TYPE, R.REL_ID FROM T_RELATIONSHIP_DATA_STORE R JOIN T_TEMP_CLEAN_LDID C ON R.ID = C.LDID_TO_DELETE OR R.ID = C.LDID_TO_REMAIN GROUP BY R.DEVICE_ID, R.REL_TYPE, R.REL_ID, C.LDID_TO_REMAIN) And the following messages: 2017-03-08 16:07:59.804+0100 INFO com.ibm.tpc.install.frontend.ia.actions.ProgressBarUpdater setPercentageComplete Component taking longer than estimated time C:\Program Files\IBM\TPC\config\install\tpcdb.xml: Percent = 2298.2456 2017-03-08 16:07:59.804+0100 INFO com.ibm.tpc.install.frontend.ia.actions.ProgressBarUpdater setPercentageComplete Seconds complete = 6550.0 The command is not completely hanging but very slow due to the deletion of million of rows. The performance of the sql delete command has been improved.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * The upgrade of IBM Spectrum Control my hang and fail to * * complete the upgrade. * **************************************************************** * PROBLEM DESCRIPTION: * * The upgrade of IBM Spectrum Control my hang and fail to * * complete the upgrade. * **************************************************************** * RECOMMENDATION: * * Apply fix maintenance when available * ****************************************************************
Problem conclusion
The fix for this APAR is targeted for the following maintenance package: | refresh pack | 5.2-TIV-TPC-RP0014 - target May 2017 Fixed in IBM Spectrum Control 5.2.14 http://www.ibm.com/support/docview.wss?&uid=swg21320822 The target dates for future refresh packs do not represent a formal commitment by IBM. The dates are subject to change without notice.
Temporary fix
Comments
APAR Information
APAR number
IT19929
Reported component name
TPC ADVANCED
Reported component ID
5608TPCA0
Reported release
52B
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2017-03-29
Closed date
2017-04-19
Last modified date
2017-04-19
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
TPC ADVANCED
Fixed component ID
5608TPCA0
Applicable component levels
[{"Business Unit":{"code":"BU029","label":"Software"},"Product":{"code":"SSNECY","label":"Tivoli Storage Productivity Center Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"52B"}]
Document Information
Modified date:
24 June 2022